CLUSTER II-CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) AT:1.ROXAS NORTH CENTRAL SCHOOL,BGY. NEW BARBACAN,ROXAS 2.SANDOVAL ES,BGY. SANDOVAL,ROXAS 3.DUMARAO ES,BGY. DUMARAO ROXAS4.SALVADOR ES BGY. DUMARAO ROXAS 5.GACAYAN ES,BGY. DUMARAO 6.CANDUYOG ES
CLUSTER II-CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) AT:1.ROXAS NORTH CENTRAL SCHOOL,BGY. NEW BARBACAN,ROXAS 2.SANDOVAL ES,BGY. SANDOVAL,ROXAS 3.DUMARAO ES,BGY. DUMARAO ROXAS4.SALVADOR ES BGY. DUMARAO ROXAS 5.GACAYAN ES,BGY. DUMARAO 6.CANDUYOG ES is a DPWH-tracked public work in Palawan 1st DEO, Region IV-B. Reported contract value: ₱994,681.82. Status: Reported complete (DPWH). Contractor on record: LEA. Figures trace to dpwh.
DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.
No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.
Total Contract Cost

