Bridges21FC0137

REPLACEMENT OF PERMANENT WEAK BRIDGES, MAMPAOD BRIDGE (B02721LZ) ALONG DAANG MAHARLIKA (LZ), BRGY. SAN ISIDRO, TALISAY, CAMARINES NORTE

REPLACEMENT OF PERMANENT WEAK BRIDGES, MAMPAOD BRIDGE (B02721LZ) ALONG DAANG MAHARLIKA (LZ), BRGY. SAN ISIDRO, TALISAY, CAMARINES NORTE is a DPWH-tracked public work in Camarines Norte DEO, Region V. Reported contract value: ₱6,859,529.94. Status: Reported complete (DPWH). Contractor on record: GLOBALCRETE BUILDERS INC. Figures trace to dpwh.

Camarines Norte DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱43,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21FC0137 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-03-31 → 2025-04-17

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REPLACEMENT OF PERMANENT WEAK BRIDGES, MAMPAOD BRIDGE (B02721LZ) ALONG DAANG MAHARLIKA (LZ), BRGY. SAN ISIDRO, TALISAY, CAMARINES NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱43,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation/Improvement of Flood Control Structures along Laniton Bridge in Barangay Laniton, Basud, Camarines Norte
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Camarines Norte DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

40 projects · ₱2.7B total · 0 flags

Other projects by this contractor

No sat.

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTO TOMAS RIVER, SAN FELIPE, ZAMBALES

Region III, Region III

2024₱193.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE & SPECIAL SUPPORT PROGRAM-CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES-SAN ILDEFONSO-RR STA. AKLE RD. CONNECTING OLD CAGAYAN VALLEY RD. & PULONG SAMPALOC-AKLE-BUASAW RD. IN SUPPORT OF THE AGRIBUSINESSES, DR

Region III, Region III

2018₱166.1M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS, DAANG MAHARLIKA (LZ), INCLUDING ROW, BULACAN 3RD LEGISLATIVE DISTRICT, PROVINCE OF BULACAN

Region III, Region III

2018₱144.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS/DIVERSION ROAD, CANDABA SAN MIGUEL BY-PASS ROAD, PACKAGE 1, INCL. ROW, BULACAN

Bulacan 2nd DEO, Region III

2018₱140.0M
Reported complete (DPWH)

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 6, SAN ILDEFONSO, BULACAN

Region III, Region III

2024₱135.1M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ANTAYAM-MAPANIQUE CREEK PHASE 5, SAN ILDEFONSO, BULACAN

Region III, Region III

2024₱135.1M
Past target date (DPWH On-Going)
View all 40 projects →

4. Implementation

Contract Amount

₱6,859,529.94

Progress

Reported complete (DPWH)

Start Date

June 21, 2021

Target End

January 14, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines NorteTalisaySanto Niño
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.