Buildings and Facilities19PJ0046

LOCAL INFRASTRUCTURE NPROGRAM- CONSTRUCTION/ COMPLETION OF BANAUE MUSEUM, DEVELOPMENT OF SPORTS COMPLEX, BARANGAY VIEWPOINT, BANAUE, IFUGAO

LOCAL INFRASTRUCTURE NPROGRAM- CONSTRUCTION/ COMPLETION OF BANAUE MUSEUM, DEVELOPMENT OF SPORTS COMPLEX, BARANGAY VIEWPOINT, BANAUE, IFUGAO is a DPWH-tracked public work in Ifugao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱1,941,908.70. Status: Reported complete (DPWH). Contractor on record: JBRACHS CONST CORP. Figures trace to dpwh.

Ifugao 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROIX-19-0021855 · ₱147,705 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,941,909 · JBRACHS CONST CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-12-30 → 2025-04-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE NPROGRAM- CONSTRUCTION/ COMPLETION OF BANAUE MUSEUM, DEVELOPMENT OF SPORTS COMPLEX, BARANGAY VIEWPOINT, BANAUE, IFUGAO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIX-19-0021855

₱147,705.00 · FY2019

Released to Zamboanga State College of Marine Sciences and Technology (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

LOCAL INFRASTRUCTURE PROGRAM – CONSTRUCTION/COMPLE

₱1,941,908.70 · JBRACHS CONST CORP

Award / contract ref: 19PJ0046

Contractor

C

12 projects · ₱58.8M total · 0 flags

Other projects by this contractor

No sat.

DESIGN AND CONSTRUCTION OF EYE - EAR DIAGNOSTIC AND LABORATORY BUILDING CUM EQUIPMENT IN THE IFSU EYE CENTER - IFUGAO STATE UNIVERSITY, ALFONSO LISTA, IFUGAO

Cordillera Administrative Region, Cordillera Administrative Region

2024₱9.9M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/ MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CALIMAG FLOOD CONTROL, CALIMAG, ALFONSO LISTA, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2020₱9.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - AMGANAD - POITAN - ROAD LEADING TO POITAN RICE TERRACES, BRGYS AMGANAD & POITAN, BANAUE, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2020₱9.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION /IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ACCESS ROAD LEADING TO MUN-ALAJA WATERFALLS, BRGY. LIWO, MAYOYAO, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2020₱9.8M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM- RESTORATION OF THE HERITAGE AND SPANISH TRAILS FOR HORSEBACK RIDING SITE IN THE MUNICIPALITY OF MAYOYAO, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2019₱4.9M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF ROADS, MONGOL- TALBOC, MAYOYAO, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2020₱2.9M
Reported complete (DPWH)
View all 12 projects →

4. Implementation

Contract Amount

₱1,941,908.70

Progress

Reported complete (DPWH)

Start Date

December 3, 2019

Target End

March 1, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)IfugaoBanaueView Point
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.