Roads22HA0009

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - BENTIG-TINIBGAN-SAMPOANGON ROAD CONNECTING TAGBILARAN NORTH ROAD IN SUPPORT TO FURNITURES AND AGRIBUSINESS INDUSTRIES, CALAPE, BOHOL

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - BENTIG-TINIBGAN-SAMPOANGON ROAD CONNECTING TAGBILARAN NORTH ROAD IN SUPPORT TO FURNITURES AND AGRIBUSINESS INDUSTRIES, CALAPE, BOHOL is a DPWH-tracked public work in Bohol 1st DEO, Region VII. Reported contract value: ₱9,506,000.00. Status: Reported complete (DPWH). Contractor on record: EC SOLICON BUILDERS. Figures trace to dpwh.

Bohol 1st DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22HA0009 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-07-29 → 2021-07-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - BENTIG-TINIBGAN-SAMPOANGON ROAD CONNECTING TAGBILARAN NORTH ROAD IN SUPPORT TO FURNITURES AND AGRIBUSINESS INDUSTRIES, CALAPE, BOHOL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures along river leading to Tubig Daku leading to Inambacan Cave and Spring, Busao, Maribojoc, Bohol
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Bohol 1st DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

108 projects · ₱3.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE II), VIGA, ANTEQUERA, BOHOL

Region VII, Region VII

2025₱101.2M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF SOLAR LED LIGHTINGS ON ROADS LEADING TO NEW BOHOL - PANGLAO INTERNATIONAL AIRPORT - PANGLAO ISLAND CIRCUMFERENTIAL ROAD (VIA

Region VII, Region VII

2022₱98.0M
Reported complete (DPWH)
No sat.

INSTALLATION OF SOLAR STREETLIGHTS ALONG BORONGAN - GUIUAN ROAD - K1037+000 - K1049+000 (S00171SM), EASTERN SAMAR

Region VIII, Region VIII

2023₱96.4M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES/STREETLIGHTS AND INTERNALLY ILLUMINATED (SOLAR) PAVEMENT MARKERS ALONG BDRY. SO. LEYTE - MAASIN - MACROHON - DAANG MAHARLIKA (S00194LT) - K1132+

Region VIII, Region VIII

2023₱96.4M
Reported complete (DPWH)
No sat.

INSTALLATION OF SOLAR STREETLIGHTS ALONG JCT. - TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD - K0917+073 - K0928+813 (S00167SM), EASTERN SAMAR

Region VIII, Region VIII

2023₱96.4M
Reported complete (DPWH)
No sat.

INSTALLATION OF SOLAR STREETLIGHTS ALONG BORONGAN - GUIUAN RD. - K0924+(-403) - K0934+394, EASTERN SAMAR

Region VIII, Region VIII

2023₱96.4M
Reported complete (DPWH)
View all 108 projects →

4. Implementation

Contract Amount

₱9,506,000.00

Progress

Reported complete (DPWH)

Start Date

March 24, 2022

Target End

September 24, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)BoholCalapeTinibgan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.