Construction of Slope Protection Structure24FB0039

Construction of Busay-Budiao Dike, Daraga, Albay

Construction of Busay-Budiao Dike, Daraga, Albay is a DPWH-tracked public work in DARAGA (LOCSIN) (ALBAY), ALBAY, Region V. Reported contract value: ₱24,498,721.87. Status: Reported complete (DPWH). Contractor on record: FEDERAL AGGREGATES AND DEVELOPMENT CORP. Figures trace to sumbong.

DARAGA (LOCSIN) (ALBAY), ALBAY, Region V
Region: Region V

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2024 · ₱38,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-24-0010942 · ₱1,524,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱23,761,060 · FEDERAL AGGREGATES AND DEVELOPMENT CORP

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2023-04-25 → 2023-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Busay-Budiao Dike, Daraga, Albay

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱38,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Barangay Namantao, Daraga, Albay
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-24-0010942

₱1,524,000.00 · FY2024

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROV-24-0010944

₱141,000.00 · FY2024

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Flood Mitigation Structures and Drainage Systems

₱23,761,060.06 · FEDERAL AGGREGATES AND DEVELOPMENT CORP

Award / contract ref: 24FB0039

Contractor

D

10 projects · ₱260.3M total · 1 flags

Other projects by this contractor

No sat.

BIP: ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CANAROM TO BARANGAY SAN RAMON, DARAGA, ALBAY (PACKAGE 2)

Albay 2nd DEO, Region V

2024₱28.8M
Past target date (DPWH On-Going)
No sat.

BIP: ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CANAROM TO BARANGAY SAN RAMON, DARAGA, ALBAY (PACKAGE 3)

Albay 2nd DEO, Region V

2024₱28.8M
Past target date (DPWH On-Going)
No sat.

BIP: ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BARANGAY CANAROM TO BARANGAY SAN RAMON, DARAGA, ALBAY (PACKAGE 4)

Albay 2nd DEO, Region V

2024₱28.8M
Past target date (DPWH On-Going)
No sat.

BIP: ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY CANAROM TO BARANGAY SAN RAMON, DARAGA, ALBAY (PACKAGE 5)

Albay 2nd DEO, Region V

2024₱28.8M
Past target date (DPWH On-Going)
No sat.

CLUSTER 14 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES

Albay 2nd DEO, Region V

2024₱28.5M
Past target date (DPWH On-Going)
No sat.

CLUSTER 7 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES

Albay 2nd DEO, Region V

2024₱28.5M
Past target date (DPWH On-Going)
View all 10 projects →

4. Implementation

Contract Amount

₱24,498,721.87

Progress

Reported complete (DPWH)

Start Date

March 20, 2024

Target End

July 26, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayDaragaBudiao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.