Buildings and Facilities19HN0034

LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE FACILITIES -CONSTRUCTION OF MULTI-PURPOSE BUILDING- CONSTRUCTION OF MULTI-PURPOSE BUILDING(COVERED COURT), BRGY. DAY-AS, CORDOVA, CEBU

LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE FACILITIES -CONSTRUCTION OF MULTI-PURPOSE BUILDING- CONSTRUCTION OF MULTI-PURPOSE BUILDING(COVERED COURT), BRGY. DAY-AS, CORDOVA, CEBU is a DPWH-tracked public work in Cebu 6th DEO, Region VII. Reported contract value: ₱2,880,900.00. Status: Reported complete (DPWH). Contractor on record: VSP STRUCTURE VENTURES CORP FORMERLY: VIRLO CONST. Figures trace to dpwh.

Cebu 6th DEO, Region VII
Region: Region VII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-CAR-19-0010230 · ₱897,498 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19HN0034 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-03-17 → 2026-02-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -  MULTIPURPOSE FACILITIES -CONSTRUCTION OF MULTI-PURPOSE BUILDING- CONSTRUCTION OF MULTI-PURPOSE BUILDING(COVERED COURT), BRGY. DAY-AS, CORDOVA, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-CAR-19-0010230

₱897,498.00 · FY2019

Released to Nueva Vizcaya District Engineering Offi Baguio General Hospital and Medical Cen (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

138 projects · ₱3.5B total · 4 flags

Other projects by this contractor

No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, PHASE 2, LILOAN, CEBU

Region VII, Region VII

2025₱154.3M
Past target date (DPWH On-Going)
No sat.

OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (DOWNSTREAM), LILOAN, CEBU

Cebu 5th DEO, Region VII

2025₱144.7M
Past target date (DPWH On-Going)

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, COMPOSTELA, CEBU

Cebu 5th DEO, Region VII

2024₱140.2M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION RIVERBANK FACILITIES ALONG CANSAGA RIVER, PACKAGE I, GARING, CONSOLACION, CEBU

Cebu 6th DEO, Region VII

2025₱135.0M
Past target date (DPWH On-Going)

Construction of Flood Control Structure along Bagatayam River, Sogod, Cebu

SOGOD (CEBU), CEBU, Region VII

2023₱106.1M
Reported complete (DPWH)
No sat.

CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY JUBAY, LILOAN, CEBU

Cebu 5th DEO, Region VII

2025₱99.0M
Past target date (DPWH On-Going)
View all 138 projects →

4. Implementation

Contract Amount

₱2,880,900.00

Progress

Reported complete (DPWH)

Start Date

July 18, 2019

Target End

October 30, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)CebuCordovaDay-as
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.