Buildings and Facilities17DC0136No coordinates published by DPWH

CONSTRUCTION OF ONE-STOREY THREE-CLASSROOM SCHOOL BUILDING, STA. CLARA NATIONAL HIGH SCHOOL, STO. TO

CONSTRUCTION OF ONE-STOREY THREE-CLASSROOM SCHOOL BUILDING, STA. CLARA NATIONAL HIGH SCHOOL, STO. TO is a DPWH-tracked public work in Batangas 3rd DEO, Region IV-A. Reported contract value: ₱3,749,571.77. Status: Reported complete (DPWH). Contractor on record: MAK-JAY CONST. Figures trace to dpwh.

Batangas 3rd DEO, Region IV-A

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region IV-A

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-D-17-0004485 · ₱3,547,396 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17DC0136 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ONE-STOREY THREE-CLASSROOM SCHOOL BUILDING, STA. CLARA NATIONAL HIGH SCHOOL, STO. TO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures along Bugaan River, Laurel, Batangas
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-D-17-0004485

₱3,547,396.00 · FY2017

Released to General Headquarters - Proper (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

63 projects · ₱487.7M total · 0 flags

Other projects by this contractor

No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, GOV. BADO DANGWA NATIONAL RD - K0306 + 590 - K0306 + 700, K0315 + 445 - K0315 + 520, KIBUNGAN, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2023₱39.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CONCRETE ROAD-PIMINGGAN-SAGUITLANG-LUBAS-DUNGON ROAD IN SUPPORT TO COFFEE, CACAO, BAMBOO, GOLD, LIVESTOCK, HIGH VALUE VEGETABLES AND FOOD PROCESSING, TUBA, BENGUET, TUBA, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2021₱39.1M
Reported complete (DPWH)
No sat.

REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS: GOV. BADO DANGWA NATIONAL ROAD - K0311+130 - K0311+150, K0313+750 - K0313+770, K0314+670 - K0314+695, K0315+143 - K0315+158, K0316+175-K0316+207, K0316+503

Benguet 2nd DEO, Cordillera Administrative Region

2022₱34.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS, TALISAY-LAUREL-AGONCILLO RD

Batangas 3rd DEO, Region IV-A

2022₱34.1M
Reported complete (DPWH)
No sat.

OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS ALONG BAGUIO-ITOGON RD (S00390LZ) - K0254+(-651)-K0255+839, K0256+321-K0257+146, ITOGON, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2022₱32.3M
Reported complete (DPWH)
No sat.

ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD CONTROL STRUC

Nueva Vizcaya DEO, Region II

2020₱27.3M
Reported complete (DPWH)
View all 63 projects →

4. Implementation

Contract Amount

₱3,749,571.77

Progress

Reported complete (DPWH)

Start Date

October 23, 2017

Target End

February 24, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)Batangas
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.