Flood Control and Drainage20BI0008

ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD CONTROL STRUC

ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD CONTROL STRUC is a DPWH-tracked public work in Nueva Vizcaya DEO, Region II. Reported contract value: ₱27,329,260.00. Status: Reported complete (DPWH). Contractor on record: MAK-JAY CONST. Figures trace to dpwh.

Nueva Vizcaya DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱16,295 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-LGRCB-20-0001132 · ₱275,322 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱27,100,913 · MAK-JAY CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-05 → 2022-06-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Nueva Vizcaya

Based on the coordinates published with the DPWH record and NOAH file NuevaVizcaya.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATION OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD  MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN   MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF RIVER FLOOD CONTROL STRUC

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱16,295,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of River Flood Control Structure, Macate Section, Phase II, Sta. 0+948 - Sta. 1+132, Bambang, Nueva Vizcaya
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-LGRCB-20-0001132

₱275,322.00 · FY2020

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Organization Outcome 2 Protect Lives and Properti

₱27,100,913.38 · MAK-JAY CONSTRUCTION

Award / contract ref: 20BI0008

Contractor

A

63 projects · ₱487.7M total · 0 flags

Other projects by this contractor

No sat.

REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, GOV. BADO DANGWA NATIONAL RD - K0306 + 590 - K0306 + 700, K0315 + 445 - K0315 + 520, KIBUNGAN, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2023₱39.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CONCRETE ROAD-PIMINGGAN-SAGUITLANG-LUBAS-DUNGON ROAD IN SUPPORT TO COFFEE, CACAO, BAMBOO, GOLD, LIVESTOCK, HIGH VALUE VEGETABLES AND FOOD PROCESSING, TUBA, BENGUET, TUBA, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2021₱39.1M
Reported complete (DPWH)
No sat.

REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS: GOV. BADO DANGWA NATIONAL ROAD - K0311+130 - K0311+150, K0313+750 - K0313+770, K0314+670 - K0314+695, K0315+143 - K0315+158, K0316+175-K0316+207, K0316+503

Benguet 2nd DEO, Cordillera Administrative Region

2022₱34.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS, TALISAY-LAUREL-AGONCILLO RD

Batangas 3rd DEO, Region IV-A

2022₱34.1M
Reported complete (DPWH)
No sat.

OFF-CARRIAGEWAY IMPROVEMENT: PAVING OF SHOULDERS ALONG BAGUIO-ITOGON RD (S00390LZ) - K0254+(-651)-K0255+839, K0256+321-K0257+146, ITOGON, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2022₱32.3M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM,CONSTRUCTION/ REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDINGS IN THE MUNICIPALITY OF AGONCILLO, BATANGAS

Batangas 3rd DEO, Region IV-A

2021₱19.5M
Reported complete (DPWH)
View all 63 projects →

4. Implementation

Contract Amount

₱27,329,260.00

Progress

Reported complete (DPWH)

Start Date

November 11, 2020

Target End

May 12, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)Nueva VizcayaBambangSanto Domingo
Storms whose wind field reached it
Peilou 2026Fung-Wong 2025Fengshen 2025Matmo 2025Mitag 2025
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.