Roads22OD0015

CONSTRUCTION OF ROAD AND DRAINAGE ALONG F. ALCANAR ST (PHASE II) WAWANG PULO, VALENZUELA CITY

CONSTRUCTION OF ROAD AND DRAINAGE ALONG F. ALCANAR ST (PHASE II) WAWANG PULO, VALENZUELA CITY is a DPWH-tracked public work in Metro Manila 3rd DEO, National Capital Region. Reported contract value: ₱19,086,748.71. Status: Reported complete (DPWH). Contractor on record: TOUGHBUILT CONST. Figures trace to dpwh.

Metro Manila 3rd DEO, National Capital Region
Region: National Capital Region

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Wall with Roads and Drainage along Benito Hao Creek, Brgy. Mapulang Lupa, Valenzuela City
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Metro Manila 3rd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

67 projects · ₱2.2B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLO RIVER (PHASE 17), VALENZUELA CITY

Metro Manila 3rd DEO, National Capital Region

2025₱142.1M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL, BRGY. BALUGO, DUMAGUETE CITY, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2023₱99.0M
Past target date (DPWH On-Going)

BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL , BRGY. CANDAU-AY, DUMAGUETE CITY, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2023₱99.0M
Reported complete (DPWH)

BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL, BRGY. CADAWINONAN, DUMAGUETE CITY, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2023₱99.0M
Reported complete (DPWH)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL AT STA. CRUZ VIEJO, TANJAY CITY, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2023₱96.5M
Reported complete (DPWH)

CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER BRGY. SAN JUAN BALAGTAS, BULACAN (STA. 14+577 TO STA. 14+781)

Bulacan 1st DEO, Region III

2023₱96.5M
Reported complete (DPWH)
View all 67 projects →

4. Implementation

Contract Amount

₱19,086,748.71

Progress

Reported complete (DPWH)

Start Date

February 8, 2022

Target End

November 4, 2022

5. Audit