TOUGHBUILT CONST is listed as a company organization in Philippine public procurement records on this site, with 67 linked DPWH project(s) totaling about ₱2,226,011,871.74. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
TOUGHBUILT CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 67
- Total value
- ₱2,226,011,871.74
- Published flags
- 0
- Region
- Metro Manila 3rd DEO · National Capital Region
Online presence
Google Maps: Toughbuilt Construction & TradingGoogle Maps, 2026-10-22
1100 Quezon Ave, Diliman, Quezon City, 1100 Metro Manila
Public Record Grade
A transparent, data-derived summary of reported public records for TOUGHBUILT CONST — not an accusation or finding of wrongdoing.
Score: 85.00 / 100 · Projects in sample: 67 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 76.1/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 76.1
- lateCompletedProjects
- 13
- onTimeCompletedProjects
- 46
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 64
- pastTargetOngoingProjects
- 5
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 67
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 67
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 67
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 67
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 67 geotagged projects (largest by contract value) — Open full map
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLO RIVER (PHASE 17), VALENZUELA CITY25OD0146 · ₱142,068,691.34 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL, BRGY. BALUGO, DUMAGUETE CITY, NEGROS ORIENTAL23HK0092 · ₱99,000,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL, BRGY. CADAWINONAN, DUMAGUETE CITY, NEGROS ORIENTAL23HK0096 · ₱99,000,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL , BRGY. CANDAU-AY, DUMAGUETE CITY, NEGROS ORIENTAL23HK0093 · ₱99,000,000.00 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL AT STA. CRUZ VIEJO, TANJAY CITY, NEGROS ORIENTAL23HK0084 · ₱96,500,000.00 · mapped
- CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER BRGY. SAN JUAN BALAGTAS, BULACAN (STA. 14+577 TO STA. 14+781)23CC0545 · ₱96,499,833.11 · mapped
- CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG BOCAUE RIVER BRGY. BAMBANG BOCAUE, BULACAN (STA. 13+041 TO STA. 13+245)23CC0547 · ₱96,498,770.69 · mapped
- CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LABASAN RIVER (WEST BANK) PACKAGE 3, TAGUIG CITY24OB0197 · ₱94,569,857.57 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER LAKESHORE AREA (PHASE 2), TAGUIG CITY25OB0130 · ₱94,568,880.92 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG C-6 OPEN CHANNEL (PHASE 18), TAGUIG CITY25OB0128 · ₱94,567,760.82 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER LAKESHORE AREA (PHASE 3), TAGUIG CITY25OB0131 · ₱94,565,100.20 · mapped
- CONSTRUCTION OF FLOOD CONTROL RIVER WALL ALONG RIGHT BANK OF ISLA CREEK, BRGY. ISLA, VALENZUELA CITY20OD0078 · ₱72,622,118.88 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG PUROK 4 OROSCO, BRGY. MAPULANG LUPA, VALENZUELA CITY20OD0131 · ₱65,690,859.11 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CASILI CREEK, CALOOCAN CITY (PHASE 2)25OD0202 · ₱57,679,034.74 · mapped
- CONSTRUCTION OF FLOOD CONTROL RIVER WALL ALONG LONGOS CREEK STA. 0+933 TO STA. 1+183, BRGY. MALANDAY, VALENZUELA CITY20OD0077 · ₱49,744,385.39 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO REIVER (PHASE 4), VALENZUELA CITY23OD0097 · ₱49,451,425.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, SPD COMPOUND, LAWTON AVE., BARANGAY WESTERN BICUTAN, TAGUIG CITY (PHASE 1)25OB0437 · ₱48,477,616.49 · mapped
- CONSTRUCTION OF FORTUNE 1 MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY GEN. T. DE LEON, VALENZUELA CITY23OD0011 · ₱48,355,806.25 · mapped
- CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT ALONG BARANGAY 66, 69, AND 70, CALOOCAN CITY24OD0015 · ₱46,891,950.84 · mapped
- CONSTRUCTION OF FLOOD CONTROL WALL ALONG LAMESA CREEK (PHASE II), BRGY. UGONG, VALENZUELA CITY20OD0084 · ₱46,537,817.40 · mapped
- IMPROVEMENT OF ROAD, LIBIS 1 & 2 (PHASE 1), BARANGAY CANUMAY EAST, VALENZUELA CITY23OD0055 · ₱46,471,872.75 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CASILI CREEK, CALOOCAN CITY (PHASE 3)25OD0203 · ₱38,451,105.61 · mapped
- REHABILITATION/ IMPROVEMENT OF TAGALAG PUMPING STATION, BRGY. TAGALAG, VALENZUELA CITY23OD0058 · ₱38,386,869.64 · mapped
- CONSTRUCTION OFFLOOD CONTROL WALL ALONG SAN AGUSTIN VILLAGE (PHASE 2), BARANGAY MAPULANG LUPA, VALENZUELA CITY21OD0093 · ₱30,447,631.07 · mapped
- CONSTRUCTION (COMPLETION) OF COED, CABA AND CEIT BUILDING BARANGAY MAYSAN,VALENZUELA CITY21OD0182 · ₱30,172,106.54 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE OF G. LAZARO ST., BRGY. DALANDANAN, VALENZUELA CITY22OD0045 · ₱27,897,501.70 · mapped
- CONSTRUCTION OF ROAD WITH DRAINAGE REHABILITATION, C. MOLINA ROAD BARANGAY VIENTE REALES, VALENZUELA CITY21OD0057 · ₱24,159,381.48 · mapped
- CONSTRUCTION OF 4-STOREY 8-CLASSROOM SCHOOL BUILDING VEINTE REALES HS, VALENZUELA CITY20OD0104 · ₱23,853,462.32 · mapped
- IMPROVEMENT OF FLOOD CONTROL RIVER WALL ALONG POLO RIVER, BARANGAY TAGALAG, VALENZUELA CITY21OD0141 · ₱23,846,498.19 · mapped
- IMPROVEMENT OF FLOOD CONTROL RIVER WALL ALONG LEFT BANK OF POLO RIVER, BARANGAY WAWANG PULO, VALENZUELA CITY21OD0139 · ₱23,844,533.95 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROAS-SECONDARY ROADS, C-3 ROAD - K0008 + (-320) - K0008 + 48620OD0144 · ₱23,812,718.34 · mapped
- CONSTRUCTION OF 4-STOREY 8-CLASSROOM SCHOOL BUILDING LINGUNAN ES, VALENZUELA CITY20OD0103 · ₱23,742,789.44 · mapped
- UPGRADING/REHABILITATION OF ROADS AND DRAINAGE, BRGYS. 86 & 87, CALOOCAN CITY21OD0124 · ₱19,134,503.54 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE ALONG F. ALCANAR ST (PHASE II) WAWANG PULO, VALENZUELA CITY22OD0015 · ₱19,086,748.71 · mapped
- CONSTRUCTION OF FLOOD CONTROL RIVER WALL ALONG MAHABANG PARANG CREEK (PHASE 2), BARANGAY BIGNAY, VALENZUELA CITY21OD0105 · ₱18,990,078.31 · mapped
- IMPROVEMENT OF MAIN ROAD, NORTHVILLE 1, BRGY. BIGNAY, VALENZUELA CITY20OD0166 · ₱14,471,915.84 · mapped
- IMPROVEMENT OF FLOOD CONTROL RIVER WALL ALONG POLO RIVER, BARANGAY TAGALAG, VALENZUELA CITY21OD0137 · ₱14,303,671.69 · mapped
- REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, RIZAL AVE - K0007 + 942 - K0008 + 533, CALOOCAN CITY20OD0141 · ₱13,078,348.39 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE OF BAYABAS ST., BRGY. BALANGKAS, VALENZUELA CITY22OD0028 · ₱12,427,279.86 · mapped
- CONSTRUCTION OF ROAD ALONG LAWANG BATO TO PUNTURIN BYPASS ROAD, BARANGAY LAWANG BATO, VALENZUELA CITY22OD0255 · ₱11,967,394.05 · mapped
- CONSTRUCTION OF ROAD INCLUDING DRAINAGE OF ANONAS ST., BRGY. BALANGKAS, VALENZUELA CITY22OD0029 · ₱10,513,734.82 · mapped
- CONSTRUCTION OF ROAD AND DRAINAGE ALONG VILLA ENCARNACION ROAD, BRGY. VEINTE RELAES, VALENZUELA CITY22OD0033 · ₱10,036,349.27 · mapped
- CONSTRUCTION OF ROADS AND DRAINAGE, BRGY. 115 AND BRGY. 116 PHASE 2, CALOOCAN CITY23OD0180 · ₱9,578,121.19 · mapped
- CONSTRUCTION OF ROAD INCLUDING DRAINAGE ALONG BRGY. 101, CALOOCAN CITY22OD0053 · ₱9,576,978.61 · mapped
- REHABILITATION OF ROAD INCLUDING DRAINAGE ALONG ST. JOHN ST., BRGY. UGONG, VALENZUELA CITY22OD0030 · ₱9,571,486.36 · mapped
- REHABILITATION OF ROADS AND DRAINAGE ALONG GUMAMELA ST., BRGY. GEN. T. DE LEON, VALENZUELA CITY21OD0183 · ₱7,667,250.19 · mapped
- CONSTRUCTION OF ROAD INCLUDING DRAINAGE ALONG ST. PAUL (BACK OF V.R. NHS), BRGY. VEINTE REALES, VALENZUELA CITY22OD0020 · ₱7,180,396.60 · mapped
- CONSTRUCTION OF ROAD INCLUDING DRAINAGE ALONG SAGIP ST., BRGY. ARKONG BATO, VALENZUELA CITY22OD0017 · ₱7,176,982.83 · mapped
- REHABILITATION OF ROADS AND DRAINAGE ALONG E. MIRANDA/ RAMOS ST., BRGY. PASO DE BLAS, VALENZUELA CITY21OD0045 · ₱6,731,798.09 · mapped
- CONSTRUCTION OF ROAD INCLUDING DRAINAGE ALONG NARRA ST., BRGY. WAWANG PULO, VALENZUELA CITY22OD0016 · ₱6,705,769.12 · mapped
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
