Roads24C00564

CONVERGENCE & SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINADIAWAN-DITAWINI BYPASS ROAD, DINADIAWAN, AURORA (PHASE 3), PROV. OF AUROR

CONVERGENCE & SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINADIAWAN-DITAWINI BYPASS ROAD, DINADIAWAN, AURORA (PHASE 3), PROV. OF AUROR is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱144,038,109.68. Status: Past target date (DPWH On-Going). Contractor on record: CAVACON CORP FORMERLY CAGAYAN VALLEY CONST. Figures trace to dpwh.

Region III, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱144,038,110 · CAVACON .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    72% reported · imagery 2021-07-07 → 2025-05-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE & SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINADIAWAN-DITAWINI BYPASS ROAD, DINADIAWAN, AURORA (PHASE 3), PROV. OF AUROR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24C00564

₱144,038,109.68 · CAVACON .

Award / contract ref: 24C00564

Contractor

C

56 projects · ₱4.2B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF BALER BYPASS ROAD, BALER, AURORA

Region III, Region III

2021₱263.0M
Reported complete (DPWH)
No sat.

WIDENING OF GENERAL SANTOS AVENUE, BRGY. LOWER BICUTAN TO BRGY. CENTRAL BICUTAN, TAGUIG CITY

National Capital Region, National Capital Region

2020₱232.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF DINGALAN-DONA REMEDIOS TRINIDAD ROAD, PROVINCE OF AURORA

Region III, Region III

2022₱193.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS-TO DECLARED TOURISM DESTINATIONS-CONCRETING OF ROAD FROM CASIGURAN TOWN PROPER LEADING TO CASAPSAPAN BAY & CASAPSAPAN TO DINIOG ROAD, PROVINCE OF AURO

Region III, Region III

2016₱193.0M
Reported complete (DPWH)
No sat.

CONVERGENCE ANS SPECIAL SUPPORT PROGRAM-BASIC INFRA PROGRAM-ACCESS ROADS AND/OR BRIDGES FR. THE NAT'L. ROAD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONST. OF DOÑA REMEDIOS TRINIDAD-DINGALAN ROAD, AURORA SECTION (PHASE 2), PROV. OF AURORA

Region III, Region III

2023₱192.3M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS-CONSTRUCTION OF BALER BYPASS ROAD, BALER, AURORA

Region III, Region III

2023₱173.7M
Reported complete (100% progress, DPWH status On-Going)
View all 56 projects →

4. Implementation

Contract Amount

₱144,038,109.68

Progress

Past target date (DPWH On-Going)

Start Date

July 18, 2024

Target End

June 12, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)AuroraDinalunganDitawini
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.