Roads21OD0048

PREVENTIVE MAINTENANCE - TERTIARY ROADS 7TH AVE. EAST - K0008+049 - K0008+123, K0008+235 - K0008+246, K0008+553 - K0008+591, K0008+892 - K0008+975, CALOOCAN CITY

PREVENTIVE MAINTENANCE - TERTIARY ROADS 7TH AVE. EAST - K0008+049 - K0008+123, K0008+235 - K0008+246, K0008+553 - K0008+591, K0008+892 - K0008+975, CALOOCAN CITY is a DPWH-tracked public work in Metro Manila 3rd DEO, National Capital Region. Reported contract value: ₱3,730,345.75. Status: Reported complete (DPWH). Contractor on record: TOUGHBUILT CONST. Figures trace to dpwh.

Metro Manila 3rd DEO, National Capital Region
Region: National Capital Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱3,730,346 · TOUGHBUILT CONST & TRADING INC

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-01-30 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱18,108,475 per km= 0.6x the National Capital Region median (n=177)

Contract cost ₱3,730,346 ÷ 0.206 km read from the DPWH title (“K0008+049 - K0008+123; K0008+235 - K0008+246; K0008+553 - K0008+591; K0008+892 - K0008+975”; K-post / station range length). National percentile: 31. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: PREVENTIVE MAINTENANCE - TERTIARY ROADS 7TH AVE. EAST - K0008+049 - K0008+123, K0008+235 - K0008+246, K0008+553 - K0008+591, K0008+892 - K0008+975, CALOOCAN CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Improvement/Upgrading of Flood Control Wall/Riprapping along Bank of various Creeks in Barangay 2 to Barangay 4, Caloocan City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Metro Manila 3rd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

21OD0048

₱3,730,345.75 · TOUGHBUILT CONST & TRADING INC

Award / contract ref: 21OD0048

Contractor

B

67 projects · ₱2.2B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLO RIVER (PHASE 17), VALENZUELA CITY

Metro Manila 3rd DEO, National Capital Region

2025₱142.1M
Past target date (DPWH On-Going)

BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL , BRGY. CANDAU-AY, DUMAGUETE CITY, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2023₱99.0M
Reported complete (DPWH)

BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL, BRGY. CADAWINONAN, DUMAGUETE CITY, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2023₱99.0M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES: CONSTRUCTION OF BANICA RIVER CONTROL, BRGY. BALUGO, DUMAGUETE CITY, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2023₱99.0M
Past target date (DPWH On-Going)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL AT STA. CRUZ VIEJO, TANJAY CITY, NEGROS ORIENTAL

Negros Oriental 2nd DEO, Negros Island Region

2023₱96.5M
Reported complete (DPWH)

CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER BRGY. SAN JUAN BALAGTAS, BULACAN (STA. 14+577 TO STA. 14+781)

Bulacan 1st DEO, Region III

2023₱96.5M
Reported complete (DPWH)
View all 67 projects →

4. Implementation

Contract Amount

₱3,730,345.75

Progress

Reported complete (DPWH)

Start Date

March 22, 2021

Target End

April 20, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of CaloocanBarangay 109
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.