Flood Control and Drainage19KG0049

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF REVETMENT/RIVERBANK PROTECTION ALONG NINGAL BRIDGE, UPSTREAM, LEFTSIDE, STA. 0+000 - STA. 0+027, STA. 0+075 - STA. 0+220, BRGY. PILI, SAPAD, LANAO DEL NORTE

CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF REVETMENT/RIVERBANK PROTECTION ALONG NINGAL BRIDGE, UPSTREAM, LEFTSIDE, STA. 0+000 - STA. 0+027, STA. 0+075 - STA. 0+220, BRGY. PILI, SAPAD, LANAO DEL NORTE is a DPWH-tracked public work in Lanao del Norte 2nd DEO, Region X. Reported contract value: ₱26,966,945.36. Status: Reported complete (DPWH). Contractor on record: LANAO BUILDER AND ENT. Figures trace to dpwh.

Lanao del Norte 2nd DEO, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-F-19-0025223 · ₱1,633,569 · release to the district office, not itemized per project

    Possible match · score 0.81

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱26,966,945 · LANAO BUILDER & ENTERPRISES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-04-13 → 2020-11-08

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Lanao del Norte

Based on the coordinates published with the DPWH record and NOAH file LanaoDelNorte.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF REVETMENT/RIVERBANK PROTECTION ALONG NINGAL BRIDGE, UPSTREAM, LEFTSIDE, STA. 0+000 - STA. 0+027, STA. 0+075 - STA. 0+220, BRGY. PILI, SAPAD, LANAO DEL NORTE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-F-19-0025223

₱1,633,569.00 · FY2019

Released to Mindanao State University - Marawi Ad (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

19KG0049

₱26,966,945.36 · LANAO BUILDER & ENTERPRISES

Award / contract ref: 19KG0049

4. Implementation

Contract Amount

₱26,966,945.36

Progress

Reported complete (DPWH)

Start Date

June 14, 2019

Target End

November 9, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)Lanao del NorteSapadPili
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.