LANAO BUILDER AND ENT is listed as a company organization in Philippine public procurement records on this site, with 286 linked DPWH project(s) totaling about ₱12,479,777,469.12. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
LANAO BUILDER AND ENT
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 286
- Total value
- ₱12,479,777,469.12
- Published flags
- 1
- Region
- Lanao del Norte 2nd DEO · Region X
Licensed officers (PCAB)
- ROSEMIA BACARAT NOOR · Authorized Managing Officer (PCAB license 15982) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for LANAO BUILDER AND ENT — not an accusation or finding of wrongdoing.
Score: 87.90 / 100 · Projects in sample: 286 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 76.3/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 76.3
- lateCompletedProjects
- 37
- onTimeCompletedProjects
- 208
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 271
- pastTargetOngoingProjects
- 26
- undatedCompletedProjectsExcluded
- 15
- Termination rate
Component score: 99/100 · Weight: 21%
- totalProjects
- 286
- componentScore
- 99
- terminatedProjects
- 1
- terminationRatePct
- 0.3
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 286
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.9/100 · Weight: 11%
- projects
- 286
- componentScore
- 99.9
- flagsPerProject
- 0
- publishedV2Flags
- 1
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 286
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 49 of 280 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- IMPRVT./WIDENING OF NATL RDS, ILIGAN CITY-MARAWI CITY RD-K1540+000-K1546+729,LANAO DEL NORTE 1ST LD17K00217 · ₱165,024,238.45 · mapped
- CONST. OF FLOOD CONTROL STRUCTURE ALONG MARANDING RIVER, INCL. ROW, PACKAGE 5, LANAO DEL NORTE24K00055 · ₱157,702,544.44 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARANDING RIVER, PACKAGE 7, LANAO DEL NORTE25K00340 · ₱150,143,030.94 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS, TUBOD-GANASSI ROAD, PACKAGE 1, LANAO DEL NORTE22K00102 · ₱141,061,101.27 · mapped
- CONST. OF MISSING LINKS/NEW ROADS, LDNICR(SALVADOR-SAPAD-NUNUNGAN-SND SECTION), PACKAGE 3, LANAO DEL18K00111 · ₱140,026,665.68 · mapped
- CONSTRUCTION OF BY-PASS & DIVERSION ROADS, CDOC-ILIGAN HINTERLAND ROAD (JCT. CDO-KIBARITAN ROAD/DANSOLIHON-JCT. IBR/ROGONGON, ILIGAN CITY) ALTERNATE ROAD, (ILIGAN CITY SECTION), ILIGAN CITY19K00138 · ₱137,365,212.79 · mapped
- CONST./MAINT. OF FLOOD MITIGATION STRUCT. 7 DRAINAGE,CONST. OF REVETMENT/RIVER CONTROL ON STEEL SHT.17K00148 · ₱133,526,958.72
- CONST. OF MISSING GAPS CONNECTING NATL ROADS,LDNICR,SALVADOR-SAPAD-NUNUNGAN-SND SECT.PACKAGE 2,LDN 217K00145 · ₱131,400,296.95 · mapped
- IMPLEMENTATION & MONITORING OF PAMANA PROJECT, CONC. OF KAWIT-PAITON-INUDARAN-DELABAYAN, KAUSWAGAN, LANAO DEL NORTE18K00323 · ₱130,871,836.16 · mapped
- ROAD WIDENING OF LINAMON-ZAMBOANGA RD.-K1594+(-140)-K1595+000,K1597+514-K1598+383,K1598+419-K1599+0218K00086 · ₱130,351,281.07 · mapped
- REHAB/RECONST./UPGRADING OF DAMAGED PNR INCL DRAINAGE BASED ON PMS/HDM-4 ALONG LINAMON-ZAMB.RD,LDN15K00309 · ₱130,169,051.32 · mapped
- CONST. OF MISSING LINKS/NEW ROADS TUBOD-GANASSI ROAD, PACKAGE 3, LANAO DEL NORTE24K00449 · ₱116,979,185.11 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, LDNICR SALVADOR - SAPAD - NUNUNGAN ROAD, PACKAGE 5, LANAO DEL NORTE20K00059 · ₱114,439,649.89 · mapped
- CLUSTER A PREVENTIVE MAINTENANCE OF VARIOUS ROAD PROJECTS IN LANAO DEL NORTE1) MALABANG-DOBLESTON-TUKURAN RD - K1970 + 749 - K1971 + 274=PHP 24,404,850.002) MALABANG-DOBLESTON-TUKURAN RD - K1972 + 570 - K1973 + 00024K00486 · ₱113,859,766.19 · mapped
- CONSTRUCTION OF MISSING LINKS/ LDNICR SALVADOR - SAPAD - NUNUNGAN ROAD, PACKAGE 8, LANAO DEL NORTE23K00271 · ₱113,423,015.61 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CDOC - ILIGAN HINTERLAND ROAD (JCT. CDO - KIBARITAN ROAD/DANSOLIHON - JCT. IBR/ROGONGON, ILIGAN CITY) ALTERNATE ROAD, PACKAGE 2, ILIGAN CITY20K00050 · ₱112,277,842.06 · mapped
- ROAD WIDENING OF ILIGAN CITY-MARAWI CITY RD.-K1536+(-982)-K1539+105,K1547+320-K1548+618, LANAO DEL N18K00108 · ₱110,589,013.99 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, TUBOD-GANASSI ROAD, LANAO DEL NORTE 1ST LD19K00052 · ₱109,862,694.77 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, LDNICR (SALVADOR-SAPAD-NUNUNGAN-SND SECTION), LANAO DEL NORTE19K00051 · ₱109,664,735.25 · mapped
- Construction of Flood Control Structure along Maranding River, Package 1, Lala, Lanao del Norte23K00105 · ₱108,491,280.90 · mapped
- IMPRVT./WIDENING OF NATL ROADS,LINAMON-ZAMBOANGA RD,K1595+000-K1597+514,K1621+291-K1622+291,LDN 2ND17K00142 · ₱99,288,395.87 · mapped
- IMPRVT./WIDENING OF NATL RDS,LDN INT. CIRC. RD TAGOLAON-BALOI SECT.,LDN15K00303 · ₱97,157,820.78 · mapped
- NETWORK DEVELOPMENT - ROAD WIDENING-PRIMARY ROADS LINAMON-ZAMBOANGA ROAD - S00968MN , K1603+255-K1606+113 , KAPATAGAN, LANAO DEL NORTE19KG0034 · ₱96,481,683.33 · mapped
- ROAD WIDENING, LINAMON - ZAMBOANGA RD - K1546+401 - K1547+543, K1547+584 - K1548+124, K1548+167 - K1550+00020K00210 · ₱96,463,999.18 · mapped
- NETWORK DEVELOPMENT PROGRAM- PAVING OF UNPAVED ROADS, - TERTIARY ROADS BACOLOD MADALUM HIGHWAY, K1575+095-K1576+480, K1576+632-K1577+550, K1577+869-K1578+152, K1578+502-K1579+399, MUNAI, LANAO DEL MORTE20KG0030 · ₱96,456,231.13 · mapped
- CONSTRUCTION OF CAUSEWAY INCLUDING FACILITIES (PHASE 1), BARANGAY POBLACION, KOLAMBUGAN, LANAO DEL NORTE24K00425 · ₱95,464,354.31 · mapped
- FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARANDING RIVER, DOWNSTREAM, MARANDING ANNEX, KAPATAGAN, LANAO DEL NORTE25KF0021 · ₱95,456,191.69 · mapped
- CONST. OF MISSING LINKS/NEW ROADS TUBOD-GANASSI ROAD, PACKAGE 6, LANAO DEL NORTE25K00346 · ₱95,014,313.35 · mapped
- CONSTRUCTION OF MISSING LINKS/ NEW ROADS, LDNICR (TANGKAL-MUNAI SECTION), LANAO DEL NORTE21K00357 · ₱94,044,970.63 · mapped
- ROAD WIDENING ILIGAN CITY-MARAWI CITY RD-K1548+618-K1553+154, LANAO DEL NORTE18K00055 · ₱93,599,492.53 · mapped
- ROAD WIDENING ALONG LINAMON-ZAMBOANGA ROAD, K1576+240-K1579+549, LANAO DEL NORTE18KF0034 · ₱93,046,272.53 · mapped
- IMPRVT./WIDENING OF NATL ROADS ALONG LINAMON-ZAMBOANGA ROAD,LDNICR,LANAO DEL NORTE16K00031 · ₱92,427,137.76 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG LINAMON-ZAMBOANGA RD-K1546+958-K1547+157, K1547+343-K1547+547, K1547+569-K1547+775, K1548+000-K1548+127, K1548+163-K1549+321, K1572+862-K1573+257, K1574+250-K1575+379, K1575+553-K1575+5625KG0024 · ₱92,069,680.00 · mapped
- ROAD WIDENING-LINAMON-ZAMBOANGA ROAD, K1544+145-K1545+620, K1545+660-K1546+401, KAUSWAGAN, LANAO DEL NORTE22KF0068 · ₱90,500,000.00 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS TUBOD-GANASSI ROAD, PACKAGE 2, LANAO DEL NORTE23K00335 · ₱89,782,781.25 · mapped
- PREVENTIVE MAINTENANCE OF ROAD:ASPHALT OVERLAY ILIGAN CITY-MARAWI CITY ROAD,K1544+230-K1544+382;K1548+704-K1549+415;K1546+186-K1548+036;K1553+285-K1553+955,BALOI & PANTAR,LANAO DEL NORTE19KG0068 · ₱88,522,895.59 · mapped
- IMPRVT./WIDENING OF NATL RDS,LINAMON-ZAMB.RDK1599+029-K1602+258,LANAO DEL NORTE 2ND LD17K00043 · ₱87,605,796.94 · mapped
- FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF REVETMENT/RIVERBANK PROTECTION ALONG CABUYAO RIVER (TRIBUTARY TO MARANDING RIVER), B01717MN, DALIGDIGAN BRIDGE, SALVADOR, LDN25KF0027 · ₱85,977,487.39 · mapped
- CONSTRUCTION OF BARANGAY HINDANG - BARANGAY MAINIT INTERCONNECTING ROAD, ILIGAN CITY25KM0015 · ₱85,914,992.04 · mapped
- CONSTRUCTION OF MISSING LINKS/NEW ROADS, PANGUIL BAY ACCESS ROAD, (TUBOD SIDE), LANAO DEL NORTE19K00055 · ₱85,349,749.62 · mapped
- ROAD WIDENING ALONG LINAMON-ZAMBOANGA ROAD, K1557+306-K1558+274, K1558+540-K1560+000, K1562+750-K1563+21519KF0087 · ₱83,344,730.15 · mapped
- ROAD UPGRADING(UNPAVED TO PAVED)BASED ON GRS,TB FOR UPGRADING TO PRS(HDM-4)OVERTON-ABAGA ROAD,LDN15K00218 · ₱82,927,989.13 · mapped
- REPLACEMENT OF PERMANENT WEAK BRIDGES, DALIGDIGAN BR. (FVR) (B01717MN) ALONG LANAO DEL NORTE INTERIOR CIRCUMFERENTIAL ROAD (LDNICR)21K00257 · ₱80,590,309.70 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS, LINAMON-ZAMBOANGA ROAD, K1619+277-K1621+503, K1622+114-K1622+291, KAPATAGAN, LANAO DEL NORTE24KF0039 · ₱80,533,857.10 · mapped
- CONSTRUCTION OF NEW BRIDGES BARIS BRIDGE ALONG TUBOD-GANASSI ROAD21KF0047 · ₱77,200,000.00 · mapped
- LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES - LOCAL ROADS, CONCRETING OF ROAD (BARANGAY PANGGAO-TAMPARAN ROAD) BARANGAY PANGAO, MUNAI, LANAO DEL NORTE21KG0025 · ₱77,143,064.93 · mapped
- CONSTRUCTION OF CONCRETE ROAD ALONG ILIGAN CITY CIRCUMFERENTIAL ROAD (C3), PHASE II, PACKAGE 3, ILIGAN CITY22KF0073 · ₱76,500,000.00 · mapped
- LOCAL PROGRAM-NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-CONSTRUCTION OF DPWH OFFICE BUILDING, DPWH LANAO DEL NORTE 2ND DEO, LALA, LANAO DEL NORTE24KF0061 · ₱76,399,876.07 · mapped
- CONSTRUCTION/IMPROVEMENTOF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES STO. NIÑO-MALIWANAG-MANAN-AO IN SUPPORT TO THE COCONUT COIR INDUSTRIES, TUBOD, LANAO DEL NORTE21KF0076 · ₱76,235,000.00 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS, ILIGAN CITY-MARAWI CITY ROAD, K1547+370-K1548+090, PANTAR, LANAO DEL NORTE20KG0055 · ₱75,752,461.82 · mapped
Equipment & capacity
PCAB license
- License no.
- 15982
- Category
- AA · Large A
- Minimum net worth for this category
- ₱90,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱450M
- License valid until
- Dec 18, 2026
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 15982); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
30 evaluations listed across 7 GPPB CPES releases; average final rating 93.0% over 15 rated projects; 30 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Jun 27, 2025 | DPWH | 24,750,000.000 (₱ thousands, as printed; flagged) | Completed | 94.8% | 97.0% | 40th, p. 182 |
| Jun 27, 2025 | DPWH | 32,696,000.160 (₱ thousands, as printed; flagged) | Completed | 93.6% | 95.2% | 40th, p. 182 |
| Jun 2, 2025 | DPWH | ₱18,915,826.00 | On-going | 92.4% | — | 40th, p. 182 |
| Jun 2, 2025 | DPWH | ₱27,782,465.00 | On-going | 82.4% | — | 40th, p. 182 |
| Apr 5, 2025 | DPWH | ₱108,491,280.00 | Completed | 95.3% | 95.3% | 40th, p. 182 |
| Mar 20, 2025 | DPWH | ₱58,183,696.00 | Completed | 97.3% | 91.3% | 39th (rev), p. 121 |
| Mar 18, 2025 | DPWH | ₱32,696,000.00 | On-going | 96.2% | — | 39th (rev), p. 121 |
| Mar 18, 2025 | DPWH | ₱46,375,821.00 | Completed | 79.5% | 89.1% | 39th (rev), p. 120 |
| Mar 18, 2025 | DPWH | ₱80,533,857.00 | Completed | 96.1% | 94.6% | 39th (rev), p. 120 |
| Nov 27, 2024 | DPWH | ₱72,872,079.00 | Completed | 93.3% | 95.3% | 39th (rev), p. 120 |
| Nov 27, 2024 | DPWH (JV) | ₱48,869,498.00 | Completed | 93.3% | 93.5% | 39th (rev), p. 121 |
| Nov 27, 2024 | DPWH | ₱115,067,347.00 | Completed | 93.3% | 89.2% | 39th (rev), p. 120 |
Showing the 12 most recent of 30.
2 amounts flagged: the printed value is implausible for a ₱-thousands column or disagrees with the DPWH award, so we show it as printed instead of converting it.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →