Buildings and Facilities16FJ0054No coordinates published by DPWH

HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) - REPAIR OF MAIN HOSPITAL BUILDING, CAWAYAN DISTRICT HS

HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) - REPAIR OF MAIN HOSPITAL BUILDING, CAWAYAN DISTRICT HS is a DPWH-tracked public work in Masbate 3rd DEO, Region V. Reported contract value: ₱2,835,307.80. Status: Reported complete (DPWH). Contractor on record: CL CARANDANG CONST AND SUPPLY CORP FORMERLY: CL CARANDANG ENT. Figures trace to dpwh.

Masbate 3rd DEO, Region V

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region V

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROVIII-16-0001091 · ₱98,182 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16FJ0054 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) - REPAIR OF MAIN HOSPITAL BUILDING, CAWAYAN DISTRICT HS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-16-0001091

₱98,182.00 · FY2016

Released to Eastern Samar National Comprehensive High SchTer (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

194 projects · ₱2.4B total · 0 flags

Other projects by this contractor

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAN RAMON RIVER, USON, MASBATE

Masbate 3rd DEO, Region V

2024₱96.4M
Reported complete (100% progress, DPWH status On-Going)

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BATUILA RIVER, BALENO, MA

Masbate 2nd DEO, Region V

2025₱85.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

NETWORK DEVELOPMENT- ROAD WIDENING- SECONDARY ROADS, MASBATE- CATAINGAN- PLACER ROAD, K0070+485- K0072+870

Masbate 3rd DEO, Region V

2019₱67.4M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF MASBATE CITY PORT-COASTAL ROAD (DIVERSION ROAD). MASBATE CITY, MASBATE

Masbate 2nd DEO, Region V

2022₱64.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS - BALUD - PALANI - PANUBIGAN - PAJO - TALISAY ROAD LEADING TO PALANI BEACHES, PANUBIGAN, PAJO AND TALISAY MANGROVE AREA, BRGY. TALIS

Masbate 2nd DEO, Region V

2020₱61.6M
Reported complete (DPWH)
No sat.

ROAD WIDENING - ALONG MINDORO WEST COASTAL RD ( S00095MR) K0231+556 - K0233+216, SAN JOSE, OCC. MINDORO

Mindoro Occidental DEO, Region IV-B

2019₱49.0M
Reported complete (DPWH)
View all 194 projects →

4. Implementation

Contract Amount

₱2,835,307.80

Progress

Reported complete (DPWH)

Start Date

April 25, 2017

Target End

July 23, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)MasbateCawayan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.