Roads24I00094

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT), K0974+500 - K0974+800, K0974+907 - K0975+150, K0984+000 - K0987+000, LEYTE 5TH

ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT), K0974+500 - K0974+800, K0974+907 - K0975+150, K0984+000 - K0987+000, LEYTE 5TH is a DPWH-tracked public work in Region VIII, Region VIII. Reported contract value: ₱146,415,385.30. Status: Reported complete (DPWH). Contractor on record: P B OBIAL CONST. Figures trace to dpwh.

Region VIII, Region VIII
Region: Region VIII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱146,415,415 · P.B. OBIAL CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-07-29 → 2025-08-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱41,325,257 per km= 1.9x the Region VIII median (n=297)

Contract cost ₱146,415,385 ÷ 3.543 km read from the DPWH title (“K0974+500 - K0974+800; K0974+907 - K0975+150; K0984+000 - K0987+000”; K-post / station range length). National percentile: 72. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT), K0974+500 - K0974+800, K0974+907 - K0975+150, K0984+000 - K0987+000, LEYTE 5TH

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

CID No. 24I00094

₱146,415,415.00 · P.B. OBIAL CONSTRUCTION

Award / contract ref: CID No. 24I00094

Contractor

A

182 projects · ₱4.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SOUTH ROAD PROPERTY (SRP)

Region VII, Region VII

2022₱241.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, VIADUCT BR. (B00081CB) ALONG CEBU SOUTH COASTAL ROAD, CEBU PROVINCE

Region VII, Region VII

2021₱173.7M
Reported complete (DPWH)
No sat.

PROPOSED BIKE LANES IN METRO CEBU, COVERING THE CITIES OF TALISAY, CEBU, MANDAUE AND LAPU-LAPU CITY

Region VII, Region VII

2020₱150.0M
Reported complete (DPWH)
No sat.

MFO 3-MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, REHABILITATION/IMPROVEMENT OF ROAD AT F.E. ZUELIG AVENUE WITH DRAINAGE FACILITIES, MANDAUE CITY

Region VII, Region VII

2017₱144.7M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0045+280 - K0045+550

Region VII, Region VII

2022₱117.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SANTANDER-BARILI-TOLEDO RD - S00303CB - K0142+000 - K0147+992

Cebu 2nd DEO, Region VII

2025₱116.7M
Past target date (DPWH On-Going)
View all 182 projects →

4. Implementation

Contract Amount

₱146,415,385.30

Progress

Reported complete (DPWH)

Start Date

March 8, 2024

Target End

October 21, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VIII (Eastern Visayas)LeyteMahaplagHilusig
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.