P B OBIAL CONST is listed as a company organization in Philippine public procurement records on this site, with 182 linked DPWH project(s) totaling about ₱4,272,397,042.92. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
P B OBIAL CONST
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 182
- Total value
- ₱4,272,397,042.92
- Published flags
- 0
- Region
- Cebu 6th DEO · Region VII
Public Record Grade
A transparent, data-derived summary of reported public records for P B OBIAL CONST — not an accusation or finding of wrongdoing.
Score: 90.50 / 100 · Projects in sample: 182 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 84.1/100 · Weight: 50%
- graceDays
- 30
- componentScore
- 84.1
- lateCompletedProjects
- 35
- onTimeCompletedProjects
- 138
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 179
- pastTargetOngoingProjects
- 6
- undatedCompletedProjectsExcluded
- 3
- Termination rate
Component score: 98.4/100 · Weight: 22%
- totalProjects
- 182
- componentScore
- 98.4
- terminatedProjects
- 1
- terminationRatePct
- 0.5
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 22%
- avgOverrunPct
- 0.1
- componentScore
- 100
- projectsWithAbcAndCost
- 181
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 182
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
Component score: 99.9/100 · Weight: 6%
- projects
- 182
- componentScore
- 99.9
- linkedObservations
- 1
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 43 of 143 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SOUTH ROAD PROPERTY (SRP)22H00032 · ₱241,249,965.97 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, VIADUCT BR. (B00081CB) ALONG CEBU SOUTH COASTAL ROAD, CEBU PROVINCE21H00004 · ₱173,700,000.00 · mapped
- PROPOSED BIKE LANES IN METRO CEBU, COVERING THE CITIES OF TALISAY, CEBU, MANDAUE AND LAPU-LAPU CITY20H00087 · ₱150,000,000.00 · mapped
- ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT), K0974+500 - K0974+800, K0974+907 - K0975+150, K0984+000 - K0987+000, LEYTE 5TH24I00094 · ₱146,415,385.30 · mapped
- MFO 3-MAINTENANCE AND CONSTRUCTION SERVICES OF OTHER INFRASTRUCTURES, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, REHABILITATION/IMPROVEMENT OF ROAD AT F.E. ZUELIG AVENUE WITH DRAINAGE FACILITIES, MANDAUE CITY17H00009 · ₱144,749,952.80 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0045+280 - K0045+55022H00045 · ₱117,247,477.66 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SANTANDER-BARILI-TOLEDO RD - S00303CB - K0142+000 - K0147+99225HE0116 · ₱116,699,991.00 · mapped
- ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DOONG BRIDGE FLOOD CONTROL STRUCTURE, OSLOB, CEBU25HE0065 · ₱115,779,956.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF HAGDAN BRIDGE FLOOD CONTROL STRUCTURE, OSLOB, CEBU25HE0089 · ₱109,415,065.90 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - VIADUCT BRIDGE (B00081CB) ALONG CEBU SOUTH COASTAL RD, CEBU CITY22HH0037 · ₱96,500,000.00 · mapped
- ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM -ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROADS-MACTAN CIRCUMFERENTIAL RD - K0014+307-K0014+592, K0019+400 - K0022+220, LAPU-LAPU CITY20HN0039 · ₱92,117,000.00 · mapped
- OO3: CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS - GENERAL AVIATION ROAD LEADING TO MACTAN-CEBU INTERNATIONAL AIRPORT, LAPU-LAPU CITY, CEBU20HN0005 · ₱91,540,277.88 · mapped
- LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONCRETING OF 3RD ST. AT STA.0+000-STA.0+080, 11TH AT STA.0+000-STA.0+100, 12TH AT STA.0+000-STA.0+070, 13TH AVENUE AT STA.0+000-STA.0+070, BENEDICTO ST. AT STA.0+000-STA.0+28020H00058 · ₱86,722,259.61 · mapped
- LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONCRETING OF EL PARDO ST., SOUTH ROAD PROPERTIES, STA.0+000 TO STA.1+080, CEBU CITY20H00060 · ₱85,500,193.74 · mapped
- /IMPVT. OF STA. FE-BANTAYAN ROAD SECTION BANTAYAN ISLAND16H00023 · ₱74,634,628.98
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ LEADING TO MANTAWI INTERNATIONAL DRIVE, HOTELS AND RESTAURANTS, MANDAUE CITY18HN0005 · ₱72,375,000.00 · mapped
- REHABILTATION/MAJOR REPAIR OF PERMANENT BRIDGES (INSTALLATION OF CARBON FIBER) ORAS BR. (B00522SM), JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE RD23IB0051 · ₱72,374,995.00 · mapped
- NETWORK DEVELOPMENT, IMPROVEMENT/WIDENING OF NATIONAL ROADS, PRIMARY ROADS, OUTSIDE N1, CEBU-TOLEDO WHARF ROAD (ULING-TOLEDO WHARF) SECTION 1: K0043+666-K0044+089, SECTION 2: K0048+552-K0053+965, SECTION 3: K0055+000-K0055+260, SECTION 4: K0055+561-K0055+16H00034 · ₱70,521,750.00 · mapped
- LP - CONSTRUCTION/REPAIR/ REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS -LOCAL ROADS AND BRIDGES - LOCAL ROADS -CONSTRUCTION OF ROAD, BRIGADIER GENERAL BENITO N EBUEN AIR BASE, LAPU-LAPU CITY21HN0028 · ₱62,667,100.00 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-TERTIARY ROADS- ESCARIO ST. (S00049CB) K0001+(-676)-K0001+009, (S00318CB) CHAINAGE 0-CHAINAGE 425, (S00319CB)- CHAINAGE 0-CHAINAGE 335, CEBU CITY22HH0049 · ₱50,728,300.00 · mapped
- LP: LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS- CONSTRUCTION OF BANGBANG - SAN MIGUEL COASTAL ROAD (ROAD CAUSEWAY), CORDOVA (CORDOBA), CEBU20HN0096 · ₱49,500,000.00 · mapped
- CONST/IMPVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, LAKE LANAO, DAANBANTAYAN18HD0001 · ₱49,000,000.00 · mapped
- ASSET PRESERVATION PROGRAM - REHABILITATION OF CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0044+890 - K0045+049 WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE22HF0091 · ₱48,869,956.00 · mapped
- CONCRETING OF BRGY. ALO FMR, BRGY. ALO, OSLOB, CEBU25HE0098 · ₱48,755,000.00 · mapped
- IMPROVEMENT/REHABILITATION OF ROAD TO F.E. ZUELLIG AVENUE LEADING TO MANDAUE PUBLIC MARKET, MANDAUE CITY16HN0004 · ₱48,377,864.06
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, MALONES-BABAYONGAN24HG0067 · ₱48,224,951.20 · mapped
- NETWORK DEVPT-OFF-CARRIAGEWAY IMPVT INCLDNG DRAINAGE, BCMD ROAD, K0107+000-K0108+000, ETC., MEDELLIN16HD0057 · ₱44,683,296.00 · mapped
- LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURE - MULTI PURPOSE / FACILITIES - CONSTRUCTION OF PROFESSIONAL REGULATION COMMISSION REGIONAL OFFICE 7 BUILDING, GOVERNMENT CENTER, SUDLON, LAHUG, CEBU CITY19HH0148 · ₱44,241,253.38 · mapped
- OO3: CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS- RECONSTRUCTION TO CONCRETE PAVEMENT - NRJ LEADING TO MANTAWI INTERNATIONAL DRIVE, HOTELS AND RESTAURANTS, MANDAUE CITY, CEBU19HN0005 · ₱39,516,367.12 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - SECOND AVENUE BR.1 (B00034CB) ALONG 2ND AVE., CEBU CITY22HH0025 · ₱39,200,000.00 · mapped
- LP: LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES -LOCAL ROADS -CONCRETING OF ROAD, BRGY. UMAPAD, MANDAUE CITY, CEBU20HN0089 · ₱38,366,864.00 · mapped
- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEV'T. MANAGEMENT-4 (HDM-4), SECONDARY ROAD, MANDAUE CAUSEWAY (OUANO)16H00058 · ₱37,759,661.70 · mapped
- CONSTRUCTION OF 4-STOREY,16-CL SCHOOL BUILDING AT MAGUIKAY HIGH SCHOOL, MANDAUE CITY, CEBU17HN0051 · ₱37,249,005.46
- REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATL RDS INCL DRAI, TOLEDO-TABUELAN-SAN REMEGIO, TABUELAN16HD0004 · ₱36,849,380.75 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM -RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - DALAGUETE BR. ALONG N. BACALSO AVE. (CEBU SOUTH RD)24HG0040 · ₱36,256,594.00 · mapped
- CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS-CONSTRUCTION OF EVACUATION CENTER AT BRGY. POBLACION, STA. CATALINA, NEGROS20H00067 · ₱34,739,997.64 · mapped
- REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGE, JALAUR BRIDGE (BP00194PN) ALONG ILOILO - CAPIZ ROAD (NEW ROUTE), BRGY. POBLACION, PASSI CITY, ILOILO18GG0043 · ₱34,446,283.74 · mapped
- STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND CONSTRUCTION OF EVACUATION CENTERS/QUARANTINE FACILITIES-REGION VII, MUNICIPALITY OF ALCANTARA, CEBU22H00065 · ₱32,166,345.00 · mapped
- CONSTRUCTION OF 4-STOREY, 12-CLASSROOM SCHOOL BUILDING AT BASAK ES, MANDAUE CITY, CEBU (BUILDING A)17HN0073 · ₱32,061,989.49
- CONSTRUCTION OF 4-STOREY, 12-CLASSROOM SCHOOL BUILDING AT BUYONG ES, LAPU-LAPU CITY, CEBU17HN0036 · ₱31,517,799.92
- CONSTRUCTION OF 4-STOREY, 12-CL SCHOOL BUILDING AT BASAK ES, MANDAUE CITY18HN0081 · ₱30,543,978.96 · mapped
- CONSTRUCTION OF 3 STOREY 10 CLASSROOM SCHOOL BUILDING PAYPAY NATIONAL HIGH SCHOOL, DAANBANTAYAN, CEBU19HD0120 · ₱30,490,864.50 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS- PRIMARY ROADS - N. BACALSO AVE (CEBU SOUTH RD) - K0068+770 - K0069+75524HG0063 · ₱30,355,000.00 · mapped
- CONSTRUCTION OF 2-UNITS, 4-STOREY, 8-CL SCHOOL BUILDING AT CABANCALAN NHS, MANDAUE CITY16HN0075 · ₱29,052,746.08
- CONSTRUCTION/REHABILITATION/IMPROVEMENT OF FACILITIES FOR PERSONS WITH DISABILITIES (PWD) AND ELDERLIES/SENIOR CITIZENS, INCLUDING GENDER-RESPONSIVE FACILITIES, DPWH REGION VII OFFICE COMPOUND, SOUTH ROAD PROPERTIES, CEBU CITY AND CEBU 1ST DEO, MEDELLIN,21H00060 · ₱28,950,000.00 · mapped
- CONSTRUCTION/REHABILITATION/IMPROVEMENT OF FACILITIES FOR PERSONS WITH DISABILITIES (PWD) AND ELDERLIES/SENIOR CITIZENS, INCLUDING GENDER-RESPONSIVE FACILITIES20H00068 · ₱28,660,084.22 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATIONSTRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PITOGO RIVER (PHASE II), CONSOLACION, CEBU20HN0044 · ₱27,923,508.63 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - M. LOGARTA BR. (B00041CB) ALONG M. LOGARTA RD., MANDAUE CITY, CEBU20HN0042 · ₱27,881,224.53 · mapped
- OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG AYDPH, K0125+000..., ANTONIO Y DE PIO HIGHWAY16HD0007 · ₱26,957,254.96 · mapped
- CONSTRUCTION OF 4-STOREY, 16-CL SCHOOL BUILDING AT BABAG NHS, LAPU-LAPU CITY16HN0086 · ₱26,226,982.36
Equipment & capacity
PCAB license
- License no.
- 16784
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Jul 30, 2029
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 16784); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
12 evaluations listed across 5 GPPB CPES releases; average final rating 92.0% over 5 rated projects; 12 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 22, 2025 | DPWH (JV) | ₱49,000,000.00 | Completed | 82.8% | 88.1% | 39th (rev), p. 231 |
| Nov 19, 2024 | DPWH | ₱146,415,385.00 | Completed | 95.3% | 95.3% | 39th (rev), p. 157 |
| Nov 10, 2024 | DPWH (JV) | ₱77,100,917.00 | On-going | 95.0% | — | 39th (rev), p. 157 |
| Sep 15, 2023 | DPWH | ₱72,374,995.00 | On-going | 97.7% | — | 36th, p. 151 |
| Jun 28, 2023 | DPWH | ₱72,374,955.00 | On-going | 87.5% | — | 36th, p. 151 |
| Jun 2, 2023 | DPWH | ₱241,249,966.00 | Final | 97.6% | 92.1% | 36th, p. 151 |
| Mar 7, 2023 | DPWH | ₱241,249,979.00 | On-going | 94.8% | — | 35th, p. 127 |
| Oct 3, 2022 | DPWH | ₱241,249,979.00 | On-going | 88.5% | — | 35th, p. 127 |
| Sep 28, 2022 | DPWH | ₱96,500,000.00 | Completed | 93.3% | 92.6% | 35th, p. 127 |
| Jun 22, 2022 | DPWH | ₱96,500,000.00 | On-going | 92.1% | — | 34th, p. 64 |
| Mar 12, 2020 | DPWH | ₱41,634,384.00 | Completed | 93.1% | 92.1% | 37th, p. 79 |
| Nov 14, 2019 | DPWH | ₱41,643,384.00 | On-going | 91.5% | — | 37th, p. 78 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →