Roads20HB0033

ASSET PRESERVATION -REHABILITATION /RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS (ASPHALT TO CONCRETE) LOAY INTERIOR ROAD KO185 + 164 - KO185 + 928; KO187 + 400 - KO188 + 659

ASSET PRESERVATION -REHABILITATION /RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS (ASPHALT TO CONCRETE) LOAY INTERIOR ROAD KO185 + 164 - KO185 + 928; KO187 + 400 - KO188 + 659 is a DPWH-tracked public work in Bohol 3rd DEO, Region VII. Reported contract value: ₱40,977,016.65. Status: Reported complete (DPWH). Contractor on record: LABB CONST DEVELOPMENT INC FORMERLY: LABB CONST. Figures trace to dpwh.

Bohol 3rd DEO, Region VII
Region: Region VII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱40,977,017 · LABB CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-04-01 → 2021-07-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION -REHABILITATION   /RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS (ASPHALT TO CONCRETE) LOAY INTERIOR ROAD KO185 + 164 - KO185 + 928; KO187 + 400 - KO188 + 659

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of flood control structures at Wahig River, Sierra Bullones, Bohol
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Bohol 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

20HB0033

₱40,977,016.65 · LABB CONSTRUCTION

Award / contract ref: 20HB0033

Contractor

B

111 projects · ₱4.8B total · 0 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS , LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD, JCT. (LIR) SAN MIGUEL-BAYONGAN-BULILIS-MABUHAY, UBAY, BOHOL, STA.0+000-STA.7+1

Region VII, Region VII

2021₱231.6M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS - PRIMARY ROADS - OTHER PRIMARY ROADS ORMOC-BAYBAY-SOUTHERN LEYTE BOUNDARY ROAD - K1043+120-K1043+325, K1043+341-K1043+809, K1043+838-K1044+870, K1046+835-K1047+147, K1047+824-K1048+091, K1048+1

Leyte 5th DEO, Region VIII

2017₱144.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE STRUCTURE, JCT. TAGBILARAN NORTH ROAD K0002 + 170 AND PEÑAFLOR STREET LEADING TO OUTFALL WITH INTEGRATED WASTE WATER TREATMENT, BARANGAY COGON, BARANG

Bohol 1st DEO, Region VII

2025₱144.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, JCT. (LIR) SAN MIGU

Region VII, Region VII

2022₱125.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION OF BY-PASS/DIVERSION ROAD, KILIM-SITIO TIPAY ROAD JUNCTION ORMOC BAYBAY SOUTHERN LEYTE BDRY. ROAD TO BUENAVISTA ...(PACKAGE 3), LEYTE 5TH LD

Region VIII, Region VIII

2021₱114.7M
Reported complete (DPWH)

Construction of Flood Mitigation Structure at Malitbog River Phase 2, Dagohoy, Bohol

DAGOHOY (BOHOL), BOHOL, Region VII

2022₱96.5M
Reported complete (DPWH)
View all 111 projects →

4. Implementation

Contract Amount

₱40,977,016.65

Progress

Reported complete (DPWH)

Start Date

December 7, 2020

Target End

June 9, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)BoholLobocQuinoguitan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.