Roads19DO0082

LOCAL PROGRAM- LOCAL ROADS AND BRIDGES- LOCAL ROADS- LOCAL INFRASTRUCTURE PROGRAM- REHABILITATION OF ROAD AT BARANGAY AMPID II, SAN MATEO, RIZAL

LOCAL PROGRAM- LOCAL ROADS AND BRIDGES- LOCAL ROADS- LOCAL INFRASTRUCTURE PROGRAM- REHABILITATION OF ROAD AT BARANGAY AMPID II, SAN MATEO, RIZAL is a DPWH-tracked public work in Rizal 2nd DEO, Region IV-A. Reported contract value: ₱1,919,658.20. Status: Reported complete (DPWH). Contractor on record: CSGER CONST CORP FORMERLY:CAGER CONST. Figures trace to dpwh.

Rizal 2nd DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROXI-19-0008543 · ₱644,144 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19DO0082 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-05-26 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL PROGRAM- LOCAL ROADS AND BRIDGES- LOCAL ROADS- LOCAL INFRASTRUCTURE PROGRAM- REHABILITATION OF ROAD AT BARANGAY AMPID II, SAN MATEO, RIZAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-19-0008543

₱644,144.00 · FY2019

Released to Davao Regional Medical Te Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

16 projects · ₱112.6M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - SAN MATEO - RODRIGUEZ RD. - K0027+500 - K0028+000, K0028+180 -

Rizal 2nd DEO, Region IV-A

2020₱19.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION AND RIVER IMPROVEMENT ALONG MANGGAHAN

Rizal 2nd DEO, Region IV-A

2020₱14.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING WITH COVERED COURT IN BRGY. SAN JOSE, MONTALBAN, RIZAL

Rizal 2nd DEO, Region IV-A

2023₱9.9M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS-SAN MATEO-RODRIGUEZ RD K0028+650 - K0028+805

Rizal 2nd DEO, Region IV-A

2022₱9.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD, TAGUMPAY TO RELOCATION, BARANGAY

Rizal 2nd DEO, Region IV-A

2024₱9.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - SN MATEO - RODRIGUEZ RD - K0025+456 - K0025+832

Rizal 2nd DEO, Region IV-A

2023₱7.1M
Reported complete (DPWH)
View all 16 projects →

4. Implementation

Contract Amount

₱1,919,658.20

Progress

Reported complete (DPWH)

Start Date

July 25, 2019

Target End

September 22, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)RizalSan MateoAmpid I
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultFlood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.