Buildings and Facilities19MG0061

CONSTRUCTION OF MULTI-PURPOSE BUILDING (MINI GYM), SOUTH WIND SUBDIVISION, BRGY. MORALES, KORONADAL CITY, SOUTH COTABATO

CONSTRUCTION OF MULTI-PURPOSE BUILDING (MINI GYM), SOUTH WIND SUBDIVISION, BRGY. MORALES, KORONADAL CITY, SOUTH COTABATO is a DPWH-tracked public work in South Cotabato 2nd DEO, Region XII. Reported contract value: ₱1,583,000.00. Status: Reported complete (DPWH). Contractor on record: EC SOLICON BUILDERS. Figures trace to dpwh.

South Cotabato 2nd DEO, Region XII
Region: Region XII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-CAR-19-0019827 · ₱5,063,000 · release to the district office, not itemized per project

    Possible match · score 0.65

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19MG0061 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-08-11 → 2025-11-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING (MINI GYM), SOUTH WIND SUBDIVISION, BRGY. MORALES, KORONADAL CITY, SOUTH COTABATO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-CAR-19-0019827

₱5,063,000.00 · FY2019

Released to Far North Luzon General Per Hospital and Training Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

108 projects · ₱3.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PHASE II), VIGA, ANTEQUERA, BOHOL

Region VII, Region VII

2025₱101.2M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF SOLAR LED LIGHTINGS ON ROADS LEADING TO NEW BOHOL - PANGLAO INTERNATIONAL AIRPORT - PANGLAO ISLAND CIRCUMFERENTIAL ROAD (VIA

Region VII, Region VII

2022₱98.0M
Reported complete (DPWH)
No sat.

INSTALLATION OF SOLAR STREETLIGHTS ALONG BORONGAN - GUIUAN ROAD - K1037+000 - K1049+000 (S00171SM), EASTERN SAMAR

Region VIII, Region VIII

2023₱96.4M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES/STREETLIGHTS AND INTERNALLY ILLUMINATED (SOLAR) PAVEMENT MARKERS ALONG BDRY. SO. LEYTE - MAASIN - MACROHON - DAANG MAHARLIKA (S00194LT) - K1132+

Region VIII, Region VIII

2023₱96.4M
Reported complete (DPWH)
No sat.

INSTALLATION OF SOLAR STREETLIGHTS ALONG JCT. - TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD - K0917+073 - K0928+813 (S00167SM), EASTERN SAMAR

Region VIII, Region VIII

2023₱96.4M
Reported complete (DPWH)
No sat.

INSTALLATION OF SOLAR STREETLIGHTS ALONG BORONGAN - GUIUAN RD. - K0924+(-403) - K0934+394, EASTERN SAMAR

Region VIII, Region VIII

2023₱96.4M
Reported complete (DPWH)
View all 108 projects →

4. Implementation

Contract Amount

₱1,583,000.00

Progress

Reported complete (DPWH)

Start Date

July 8, 2019

Target End

October 5, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)South CotabatoCity of KoronadalMorales
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.