Water Provision and Storage25CM0032

CSSP, BIP, PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF SUBIC WATER SYSTEM AT BATIAWAN, SUBIC, ZAMBALES

CSSP, BIP, PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF SUBIC WATER SYSTEM AT BATIAWAN, SUBIC, ZAMBALES is a DPWH-tracked public work in Zambales 2nd DEO, Region III. Reported contract value: ₱19,599,949.07. Status: Past target date (DPWH On-Going). Contractor on record: MICKAJETTE CONST AND TRADING. Figures trace to dpwh.

Zambales 2nd DEO, Region III
Region: Region III

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱19,437,294 · MICKAJETTE CONSTRUCTION AND TRADING

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    88% reported · imagery 2023-11-27 → 2025-08-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CSSP, BIP, PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF SUBIC WATER SYSTEM AT BATIAWAN, SUBIC, ZAMBALES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Stabilization Structure along Gabor River, Phase 1, San Felipe, Zambales
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Zambales 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25CM0032 - Const of Subic Water System at Batiawan

₱19,437,293.55 · MICKAJETTE CONSTRUCTION AND TRADING

Contractor

A

169 projects · ₱1.5B total · 1 flags

4. Implementation

Contract Amount

₱19,599,949.07

Progress

Past target date (DPWH On-Going)

Start Date

May 19, 2025

Target End

November 14, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CSSP, BIP, PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF SUBIC WATER SYSTEM AT BATIAWAN, SUBIC, ZAMBALES.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/57d1839e-5182-4532-951a-ab21a3419c59

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)ZambalesSubicBatiawan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.