Buildings and Facilities21JF0042

CONSTRUCTION OF MULTI-PURPOSE BUILDING (BRGY. HALL), CALULA, R.T. LIM, ZAMBOANGA SIBUGAY

CONSTRUCTION OF MULTI-PURPOSE BUILDING (BRGY. HALL), CALULA, R.T. LIM, ZAMBOANGA SIBUGAY is a DPWH-tracked public work in Zamboanga Sibugay 2nd DEO, Region IX. Reported contract value: ₱1,960,332.29. Status: Reported complete (DPWH). Contractor on record: GJD CONST. Figures trace to dpwh.

Zamboanga Sibugay 2nd DEO, Region IX
Region: Region IX

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱42,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱1,960,332 · GJD CONSTRUCTION & SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-01-31 → 2019-12-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING (BRGY. HALL), CALULA, R.T. LIM, ZAMBOANGA SIBUGAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱42,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Lanao-Pagadian-Zamboanga City Road, Bacalan River (Phase I) (Upstream), Zamboanga Sibugay
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Zamboanga Sibugay 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of Multi-Purpose Building (Barangay

₱1,960,332.29 · GJD CONSTRUCTION & SUPPLY

Award / contract ref: 21JF0042

Contractor

B

77 projects · ₱177.1M total · 0 flags

4. Implementation

Contract Amount

₱1,960,332.29

Progress

Reported complete (DPWH)

Start Date

February 22, 2021

Target End

May 22, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF MULTI-PURPOSE BUILDING (BRGY. HALL), CALULA, R.T. LIM, ZAMBOANGA SIBUGAY.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/582e001d-69e9-402c-9842-681067b438f8

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region IX (Zamboanga Peninsula)Zamboanga SibugayRoseller LimCalula
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.