Buildings and Facilities21OF0199

CONSTRUCTION OF MULTI-PURPOSE BUILDING (LIVELIHOOD AND TRAINING CENTER) AT BARANGAY VASRA, QUEZON CITY

CONSTRUCTION OF MULTI-PURPOSE BUILDING (LIVELIHOOD AND TRAINING CENTER) AT BARANGAY VASRA, QUEZON CITY is a DPWH-tracked public work in Quezon City 1st DEO, National Capital Region. Reported contract value: ₱9,506,056.99. Status: Reported complete (DPWH). Contractor on record: PERRC INC FORMERLY: P E R R C CONST. Figures trace to dpwh.

Quezon City 1st DEO, National Capital Region
Region: National Capital Region

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2021 · ₱50,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21OF0199 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-11-03 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING (LIVELIHOOD AND TRAINING CENTER) AT BARANGAY VASRA, QUEZON CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures and Tributaries, Barangay Commonwealth (Phase 6), Quezon City
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Quezon City 1st DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

43 projects · ₱2.5B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRASTRUCTURE PROJS. ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL RDS. &/OR BRS. (OR,RDS. THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONST. OF BYPASS RD. (PHASE 8) AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE

Region III, Region III

2024₱283.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL RDS. &/OR BRS. (OR,RDS. THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONST. OF BYPASS RD. AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE CITY (PHASE 9), B

Region III, Region III

2024₱193.0M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS & BRIDGES-LOCAL ROADS-CONSTRUCTION OF BYPASS ROAD AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE, PROVINCE OF BULACAN

Region III, Region III

2021₱188.0M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE STRUCTURES & OTHER ANCILLARY WORKS, KO139+800-KO141+891

Region IV-B, Region IV-B

2018₱144.8M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE & OTHER ANCILLARY WORKS, KO226+400-KO226+537; KO226+562-KO228+954, BATARAZA, PALAWAN

Region IV-B, Region IV-B

2018₱144.8M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) TO SIX (6) LANES INCL DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS K0175+627-K0176+185; K0176+194-K0177+880, BROOKE'S POINT, PALAWAN

Region IV-B, Region IV-B

2018₱135.1M
Reported complete (DPWH)
View all 43 projects →

4. Implementation

Contract Amount

₱9,506,056.99

Progress

Reported complete (DPWH)

Start Date

November 9, 2021

Target End

June 6, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF MULTI-PURPOSE BUILDING (LIVELIHOOD AND TRAINING CENTER) AT BARANGAY VASRA, QUEZON CITY.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/587a699a-d111-420f-8517-11d557c4832e

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)Quezon CityVasra
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.