Roads21HM0026

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PREVENTIVE MAINTENANCE SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0013 + 095 K0014 + 174, K0016 + 000 K0016 + 150, K0019 + 152 K0020 + 137

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PREVENTIVE MAINTENANCE SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0013 + 095 K0014 + 174, K0016 + 000 K0016 + 150, K0019 + 152 K0020 + 137 is a DPWH-tracked public work in Siquijor DEO, Negros Island Region. Reported contract value: ₱46,519,124.06. Status: Reported complete (DPWH). Contractor on record: VIKING CONST. Figures trace to dpwh.

Siquijor DEO, Negros Island Region
Region: Negros Island Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱1,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21HM0026 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-02-07 → 2015-02-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PREVENTIVE MAINTENANCE SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0013 + 095  K0014 + 174, K0016 + 000 K0016 + 150, K0019 + 152 K0020 + 137

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱1,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure/Drainage Structure along Siquijor Circumferential Road, Siquijor
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Siquijor DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

226 projects · ₱7.7B total · 0 flags

Other projects by this contractor

No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - MANILA NORTH ROAD K0524+564-K0526+321, K0555+000-K0555+896; K0556+047-K0557+100; K0561+000-K0561+122; K0563+556-K0564+000; K0526+321-K0526+469; K0555+000-K0555+158; K0555+1

Region I, Region I

2018₱190.0M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO-SOLANA DIVERSION ROAD, PACKAGE 2, CAGAYAN

Region II, Region II

2023₱187.8M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO-SOLANA DIVERSION ROAD (TUGUEGARAO-SOLANA BRIDGE AND APPROACHES)-PHASE 1

Region II, Region II

2023₱187.8M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO-ENRILE DIVERSION RD (INCL. TUGUEGARAO-ENRILE BRIDGE AND APPROACHES) PHASE 1

Region II, Region II

2023₱186.9M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS, PANCIAN, PAGUDPUD - ADAMS ROAD LEADING TO DIFFERENT WATERFALLS ADAMS, ILOCOS NORTE

Region I, Region I

2016₱147.9M
Reported complete (DPWH)
No sat.

OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM : ASSET PRESERVATION- REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS: SECONDARY ROADS - CAGAYAN VALLEY ROAD (MAGAPIT-JCT. APARRI AIRPORT SECTION), K0575+000 - K0580+000,CAMALANIUGAN

Region II, Region II

2018₱126.4M
Reported complete (DPWH)
View all 226 projects →

4. Implementation

Contract Amount

₱46,519,124.06

Progress

Reported complete (DPWH)

Start Date

May 6, 2021

Target End

August 23, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Negros Island Region (NIR)SiquijorLarenaCanlambo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-11-03El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.