Construction of Flood Mitigation Structure20MA0119

Construction of River Protection Dike, Brgy. Calian, Mangudadatu, Maguindanao

Construction of River Protection Dike, Brgy. Calian, Mangudadatu, Maguindanao is a DPWH-tracked public work in MAGUINDANAO DEL SUR, Region XII. Reported contract value: ₱48,600,631.28. Status: Reported complete (DPWH). Contractor on record: FFJJ CONST. Figures trace to sumbong.

MAGUINDANAO DEL SUR, Region XII
Region: Region XII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱50,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-20-0014752 · ₱59,000,000

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20MA0119 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-02-13 → 2023-01-26

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Maguindanao del Sur

Based on the coordinates published with the DPWH record and NOAH file Maguindanao.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of River Protection Dike, Brgy. Calian, Mangudadatu, Maguindanao

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construcion of Simuay Flood Control (River Bank Protection with Revetment), Sta.0+000-Sta.0+940, Sta.1+440-Sta.2+460, Macaguiling, Sultan Kudarat, Maguindanao
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-20-0014752

₱59,000,000.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-20-0015900

₱18,772,000.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-20-0014864

₱9,386,000.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-20-0016106

₱165,700,000.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXII-20-0000915

₱486,456.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXII-20-0013759

₱310,974.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXII-20-0001543

₱127,000.00 · FY2020

DBM SARO listing (source)

Office-level release, not tied to this specific contract

SARO SARO-ROXII-20-0001540

₱1,254,000.00 · FY2020

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱48,600,631.28

Progress

Reported complete (DPWH)

Start Date

October 22, 2020

Target End

March 16, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Bangsamoro Autonomous Region In Muslim Mindanao (BARMM)Maguindanao del SurMangudadatuDaladagan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.