24 DPWH public works projects are recorded in Maguindanao del Sur (Region Xii), with start dates from 2020 to 2024. Recorded contract values total about ₱1,578,150,276.06. 24 are recorded at 100% progress and 16 are flood control works. Figures are as recorded by DPWH; they are not findings.
The largest recorded project is “Construction of Flood Control Structure, Maslabeng Phase I, Buluan, Maguindanao” at ₱96,499,939.49. The contractor with the most recorded projects in Maguindanao del Sur is FFJJ CONST (8 projects). The most common type of work is construction of flood mitigation structure (16 projects).
Largest recorded projects
- Construction of Flood Control Structure, Maslabeng Phase I, Buluan, Maguindanao₱96,499,939.49
- Construction of Flood Control Structure, Maslabeng Phase Ii, Buluan, Maguindanao₱96,499,063.51
- Construction of River Bank Protection Along Alip River (Phase I), Datu Paglas, Maguindanao₱96,008,853.82
- Construction of Flood Control Structure, Calean, Mangudadatu, Maguindanao₱95,999,761.10
- Construction of Flood Control Structure, Butalo, Datu Salibo, Maguindanao₱91,674,665.27
- Construction of River Bank Protection (Revetment) Phase 1, Datu Piang, Maguindanao₱91,674,403.59
- Construction of Flood Control, Maslabeng Phase Ii, Buluan, Maguindanao₱81,000,521.20
- Construction of Flood Control, Maslabeng Phase I, Buluan, Maguindanao₱80,831,781.63
- Construction of Flood Control Structure, Calian, Mangudadatu, Maguindanao₱80,300,725.51
- Construction of Revetment Along Rio Grande de Mindanao (Downstream), Brgy. Buayan to Brgy. Kinudal (Phase I), Datu Piang, Maguindanao₱79,932,563.97
- Construction of Revetment Along Rio Grande de Mindanao (Downstream), Brgy. Buayan to Brgy. Kinudal (Phase Ii), Datu Piang, Maguindanao₱78,992,559.63
- Construction of Revetment Along Rio Grande de Mindanao (Upstream), Brgy. Reina Regente, Datu Piang, Maguindanao₱78,620,793.02
- Construction of Tunggol Protection Dike, Phase 3, Datu Montawal, Maguindanao₱74,329,125.00
- Construction of River Bank Protection (Riprap) at Barangay Maslabeng, Buluan, Maguindanao₱49,399,692.30
- Construction of River Protection Dike, Brgy. Calian, Mangudadatu, Maguindanao₱48,600,631.28
- Construction of River Protection Dike, Brgy. Calian, Mangudadatu, Maguindanao₱48,600,631.28
- Construction of Slope Protection Dike, Brgy. Maslabeng, Buluan, Maguindanao₱48,512,932.29
- Construction of Slope Protection Dike, Brgy. Maslabeng, Buluan, Maguindanao₱48,512,932.29
- Construction of Pulangi Bank Protection, Right Bank of Tunggol Floodway, Package B-Phase 4, Datu Montawal, Maguindanao₱47,646,875.00
- Construction of Pulangi Bank Protection, Right Bank of Tunggol Floodway, Package A-Phase 2, Pagalungan, Maguindanao₱47,646,875.00
- Construction of Riverbank Protection (Phase I), Datu Piang, Maguindanao₱47,283,436.87
- Construction of Riverbank Protection (Revetment) Along Butalo River Phase I, Datu Salibo, Maguindanao₱23,995,000.03
- Construction of Riverbank Protection (Revetment) Phase I, Datu Piang, Maguindanao₱23,995,000.00
- Construction of River Protection Phase I, Barangay Tumbao, Mangudadatu, Maguindanao₱21,591,512.98