Buildings and Facilities16PD0034No coordinates published by DPWH

CY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF-BATCH 9)-CONSTRUCTION OF 4 STOREY 8 CLASSROOMS MIL-AN NHS

CY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF-BATCH 9)-CONSTRUCTION OF 4 STOREY 8 CLASSROOMS MIL-AN NHS is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱14,705,216.03. Status: Reported complete (DPWH). Contractor on record: KUATAKO CONSTRUCTION. Figures trace to dpwh.

Baguio City DEO, Cordillera Administrative Region

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVI-16-0011713 · ₱60,921,463 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱14,705,216 · KUATAKO CONSTRUCTION & GENERAL CONTRACTOR

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CY-2016 BASIC EDUCATIONAL FACILITIES FUND (BEFF-BATCH 9)-CONSTRUCTION OF 4 STOREY 8 CLASSROOMS MIL-AN NHS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Rehabilitation of Flood Mitigation Structures / Drainage System along Crystal Cave to Asin Flood Control, Crystal Cave to Asin, Baguio City
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-16-0011713

₱60,921,463.00 · FY2016

Released to Western Visayas Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱14,705,216.03

Progress

Reported complete (DPWH)

Start Date

October 25, 2016

Target End

May 22, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of Baguio
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.