Flood Control and Drainage25KH0036

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE (PHASE I), CDOC-ILIGAN CITY HINTERLAND ROAD (JCT. CDO CAMP KIBARITAN ROAD-DOMINOROG ROAD, DANSOLIHON-JCT. IBR, ROGONGON, ILIGAN CITY) ALTERNATE ROAD, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE (PHASE I), CDOC-ILIGAN CITY HINTERLAND ROAD (JCT. CDO CAMP KIBARITAN ROAD-DOMINOROG ROAD, DANSOLIHON-JCT. IBR, ROGONGON, ILIGAN CITY) ALTERNATE ROAD, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL is a DPWH-tracked public work in Cagayan de Oro City 1st DEO, Region X. Reported contract value: ₱47,873,700.00. Status: Past target date (DPWH On-Going). Contractor on record: CAGALAWAN ENT. Figures trace to dpwh.

Cagayan de Oro City 1st DEO, Region X
Region: Region X

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25KH0036 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    88% reported · imagery 2022-10-31 → 2025-05-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Misamis Oriental

Based on the coordinates published with the DPWH record and NOAH file MisamisOriental.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF SLOPE PROTECTION STRUCTURE (PHASE I), CDOC-ILIGAN CITY HINTERLAND ROAD (JCT. CDO CAMP KIBARITAN ROAD-DOMINOROG ROAD, DANSOLIHON-JCT. IBR, ROGONGON, ILIGAN CITY) ALTERNATE ROAD, CAGAYAN DE ORO CITY, MISAMIS ORIENTAL

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Cagayan de Oro River, Brgy. Mambuaya (Section 8), Cagayan de Oro City
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Cagayan de Oro City 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

452 projects · ₱4.0B total · 0 flags

4. Implementation

Contract Amount

₱47,873,700.00

Progress

Past target date (DPWH On-Going)

Start Date

March 18, 2025

Target End

October 15, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)City of Cagayan De OroDansolihon
Storms whose wind field reached it
Koto 2025Jelawat 2023
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.