Flood Control and Drainage16OH0051No coordinates published by DPWH

DREDGING/DESILTING OF CUT-CUT CREEK (PHASE II), PASAY CITY LONE DISTRICT

DREDGING/DESILTING OF CUT-CUT CREEK (PHASE II), PASAY CITY LONE DISTRICT is a DPWH-tracked public work in South Manila DEO, National Capital Region. Reported contract value: ₱9,121,859.74. Status: Reported complete (DPWH). Contractor on record: ARKY CONST AND SUPPLY. Figures trace to dpwh.

South Manila DEO, National Capital Region

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: National Capital Region

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱7,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXIII-16-0003972 · ₱43,000 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16OH0051 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: DREDGING/DESILTING OF CUT-CUT CREEK (PHASE II), PASAY CITY LONE DISTRICT

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱7,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Estero de Pandacan (Flood Control Structure and Fencing), Zone 92/93, Pandacan, Manila 6th LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXIII-16-0003972

₱43,000.00 · FY2016

Released to Amando A. Fabio Memorial National High School Relea (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

76 projects · ₱4.0B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-BALUD NATIONAL ROAD CONNECTING BARANGAY DANAO IN SUPPORT OF AGRIBUSINESS, BALUD, MASBATE PROVINCE

Region V, Region V

2018₱179.1M
Reported complete (DPWH)
No sat.

CONST./REPAIR/REHAB./IMPVT. OF SWANG-AGPANABAT ROAD, ROMBLON, ROMBLON STA.15+290-STA.15+603.35, STA.15+877.92-STA. 16+637.30 STA.16+895.50-STA. 17+208.80, STA.17+500.00-STA.-STA.17+857.80 STA. 18+295.80-STA.20+513.60, STA. 20+660.00-STA.21+617.00 W/EXCEPT

Region IV-B, Region IV-B

2016₱168.4M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS-MASBATE-CATAINGAN-PLACER ROAD, MASBATE PROVINCE

Region V, Region V

2018₱155.6M
Reported complete (DPWH)
No sat.

ROAD UPGRADING OF SIBUYAN CIRC RD K0023+563-K0025+487; K0025+524-K0026+198; K0027+1086-K0029+237; SI

Region IV-B, Region IV-B

2016₱146.2M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) OF SIBUYAN CIRCUM. RD., KO029+237-KO030+346; KO030+408-KO031+364; KO031+431-KO031+497; KO031+571-KO031+638; KO032+555-KO033+073; KO033+086-KO033+615; KO034+094-KO035+690; KO035+908-KO036+528, SIBUYAN IS., ROMBLON

Region IV-B, Region IV-B

2016₱145.8M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, SAN FERNANDO-SAN JACINTO-MONREAL ROAD, MASBATE, TICAO ISLAND, MASBATE

Region V, Region V

2018₱144.7M
Reported complete (DPWH)
View all 76 projects →

4. Implementation

Contract Amount

₱9,121,859.74

Progress

Reported complete (DPWH)

Start Date

June 14, 2016

Target End

May 8, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Not yet linked to a PSGC area.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.