Bridges24C00036No coordinates published by DPWH

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD-PACKAGE 3, PROVINCE OF ZAMBALES

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD-PACKAGE 3, PROVINCE OF ZAMBALES is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱192,999,807.95. Status: Reported complete (DPWH). Contractor on record: LEADWAY CONST. Figures trace to dpwh.

Region III, Region III

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region III

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24C00036 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS, CAPAS-BOTOLAN ROAD-PACKAGE 3, PROVINCE OF ZAMBALES

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

27 projects · ₱3.2B total · 0 flags

Other projects by this contractor

No sat.

NETWORK DEVELOPMENT PROGRAM; CONSTRUCTION OF FLYOVERS/INTERCHANGES/UNDERPASSES/LONG SPAN BRIDGES; CUTCUT FLYOVER ALONG FRIENDSHIP CIRCUM RD. PAMPANGA

Pampanga 3rd DEO, Region III

2023₱289.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS-TO DECLARED TOURISM DESTINATIONS, CLARK GREEN CITY-MAC ARTHUR ACCESS ROAD LEADING TO CLARK GREEN CITY, INCLUDING BRIDGES, TARLAC 3RD L.D. PROV. OF TAR

Region III, Region III

2017₱233.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES, CHICO KARAYAN BR. (B00924LZ) ALONG MT. PROVINCE - NUEVA VIZCAYA RD.

Cordillera Administrative Region, Cordillera Administrative Region

2018₱208.3M
Reported complete (DPWH)
No sat.

CONST/IMPT OF ACCESS RDS LEADING TO AIRPORTS, SEAPORTS & TOURIST DEST-CONST OF A NEW CLARKGREEN

Tarlac 2nd DEO, Region III

2016₱184.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATION CONSTRUCTION OF CONCRETE BRIDGE POBLACION-LAPPA-MARAG ROAD LEADING TO MARAG VALLEY (BRIDGE CONSTRUCTION - PHASE 1), LUNA, APAYAO

Cordillera Administrative Region, Cordillera Administrative Region

2017₱173.4M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS, BACOLOR-PORAC ACCESS ROAD (PORAC SECTION)-PACKAGE 1, PROVINCE OF PAMPANGA

Region III, Region III

2023₱172.1M
Past target date (DPWH On-Going)
View all 27 projects →

4. Implementation

Contract Amount

₱192,999,807.95

Progress

Reported complete (DPWH)

Start Date

February 29, 2024

Target End

February 22, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Not yet linked to a PSGC area.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.