Buildings and Facilities19CG0110

REHABILITATION/ IMPROVEMENT OF MULTI-PURPOSE COVERED COURT AT PANIPUAN, MEXICO, PAMPANGA

REHABILITATION/ IMPROVEMENT OF MULTI-PURPOSE COVERED COURT AT PANIPUAN, MEXICO, PAMPANGA is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱1,873,886.25. Status: Reported complete (DPWH). Contractor on record: DAUNGAN CONST DEV'T. Figures trace to dpwh.

Pampanga 1st DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROII-19-0008831 · ₱269,451 · release to the district office, not itemized per project

    Possible match · score 0.68

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19CG0110 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-02-08 → 2025-11-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/ IMPROVEMENT OF MULTI-PURPOSE COVERED COURT AT PANIPUAN, MEXICO, PAMPANGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROII-19-0008831

₱269,451.00 · FY2019

Released to Veterans General Hospital (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

80 projects · ₱707.8M total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MALISIK - MABATO - SALAPUNGAN ROAD, CANDABA, PAMPANGA

Pampanga 1st DEO, Region III

2024₱47.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SLOPE PROTECTION WORKS AT MAASIM RIVER, PHASE II (TRIBUTARY OF PAMPANGA RIVER) BARANGAY PULONG GUBAT, CANDABA, PAMPANGA

Pampanga 1st DEO, Region III

2023₱32.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION / REHABILITATION OF MEXICO -MAGALANG ROAD / NINOY AQUINO BYWAY (ANAO, MEXICO - SAN ANTONIO, ARAYAT SECTION) MEXICO AND ARAYAT, PAMPANGA

Pampanga 1st DEO, Region III

2019₱27.8M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. ANA CENTRAL HIGH SCHOOL, STA. LUCIA, STA. ANA, PAMPANGA

Pampanga 1st DEO, Region III

2023₱27.8M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SLOPE PROTECTION ALONG PAMPANGA RIVER, STA. 0+000 - STA. 0+023, CANDATING SECTION, ARAYAT, PAMPANGA

Pampanga 1st DEO, Region III

2021₱27.1M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROADS INCLUDING DRAINAGE CANAL, CANDABA, PAMPANGA

Pampanga 1st DEO, Region III

2024₱26.8M
Reported complete (DPWH)
View all 80 projects →

4. Implementation

Contract Amount

₱1,873,886.25

Progress

Reported complete (DPWH)

Start Date

July 19, 2019

Target End

October 16, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)PampangaMexicoPanipuan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.