Bridges17B00008No coordinates published by DPWH

MFO 1- NATIONAL ROAD NETWORK SERVICES: CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES, TAGARAN BRIDGE (B01181LZ) ALONG DAANG MAHARLIKA

MFO 1- NATIONAL ROAD NETWORK SERVICES: CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES, TAGARAN BRIDGE (B01181LZ) ALONG DAANG MAHARLIKA is a DPWH-tracked public work in Region II, Region II. Reported contract value: ₱90,803,054.53. Status: Reported complete (DPWH). Contractor on record: ADVANCED FOUNDATION CONST SYSTEMS CORP. Figures trace to dpwh.

Region II, Region II

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region II

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17B00008 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: MFO 1- NATIONAL ROAD NETWORK SERVICES: CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG   NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES, TAGARAN BRIDGE (B01181LZ) ALONG  DAANG MAHARLIKA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

39 projects · ₱5.6B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: NAGUILIAN BRIDGE ALONG DAANG MAHARLIKA (LZ)(PARALLEL BRIDGE)

Region II, Region II

2020₱969.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SIFFU BRIDGE (B01157LZ) ALONG SANTIAGO-TUGUEGARAO ROAD, ROXAS, ISABELA

Region II, Region II

2019₱542.4M
Past target date (DPWH On-Going)
No sat.

LOCALLY FUNDED PROJECTS: ONSTRUCTION/ REHAB./ IMPV'T OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, ROADS AND BRIDGES- LOCAL BRIDGES: CONST'N OF PIGALO BRIDGE & APPROACHES ALONG ALICIA-ANGADANAN-SAN GUILLERMO PROVINCIAL ROAD, ANGADANAN, ISABELA

Region II, Region II

2016₱437.1M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: WIDENING OF PERMANENT BRIDGES: MINANGA BRIDGE (B01129LZ) ALONG DAANG MAHARLIKA (LZ) (PARALLEL BRIDGE), TUMAUINI, ISABELA

Region II, Region II

2020₱374.5M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM :CONSTRUCTION OF MISSING LINKS/NEW ROADS: JCT. CAGAYAN VALLEY ROAD-SAMPAGUITA-WARAT-LA SUERTE-CATARAUAN-AFUSING ROAD (AMULUNG BRIDGE AND APPROACHES), CAGAYAN

Region II, Region II

2022₱347.2M
Reported complete (DPWH)

WIDENING OF BRIDGE - SIBALOM BR. (B00123PN) ALONG ILOILO - ANTIQUE RD

Region VI, Region VI

2019₱259.4M
Reported complete (DPWH)
View all 39 projects →

4. Implementation

Contract Amount

₱90,803,054.53

Progress

Reported complete (DPWH)

Start Date

February 13, 2017

Target End

February 15, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Not yet linked to a PSGC area.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.