Roads18EE0138

CONSTRUCTION OF CONCRETE ROAD EL NIDO-JCT. NEW IBAJAY ROAD LEADING TO ILLECAVE, BRGY. NEW IBAJAY, STA.0+000-STA.0+780

CONSTRUCTION OF CONCRETE ROAD EL NIDO-JCT. NEW IBAJAY ROAD LEADING TO ILLECAVE, BRGY. NEW IBAJAY, STA.0+000-STA.0+780 is a DPWH-tracked public work in Palawan 1st DEO, Region IV-B. Reported contract value: ₱23,642,439.14. Status: Reported complete (DPWH). Contractor on record: YURICH BUILDERS AND CONST SUPPLY INC. Figures trace to dpwh.

Palawan 1st DEO, Region IV-B
Region: Region IV-B

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIVB-18-0005523 · · release to the district office, not itemized per project

    Possible match · score 0.79

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18EE0138 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2012-12-19 → 2012-12-19

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱30,310,819 per km= 1.0x the Region IV-B median (n=234)

Contract cost ₱23,642,439 ÷ 0.78 km read from the DPWH title (“STA.0+000-STA.0+780”; K-post / station range length). National percentile: 58. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF CONCRETE ROAD EL NIDO-JCT. NEW IBAJAY ROAD LEADING TO ILLECAVE, BRGY. NEW IBAJAY, STA.0+000-STA.0+780

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Batacalan Bridge, CBNR, Palawan
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIVB-18-0005523

₱0.00 · FY2018

Released to Division of Palawan (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

158 projects · ₱6.0B total · 1 flags

4. Implementation

Contract Amount

₱23,642,439.14

Progress

Reported complete (DPWH)

Start Date

July 5, 2018

Target End

November 29, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
MIMAROPA RegionPalawanEl NidoNew Ibajay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.