Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, Sta. Maria - San Bartolome Section, Tarlac (Package C)
Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, Sta. Maria - San Bartolome Section, Tarlac (Package C) is a DPWH-tracked public work in CONCEPCION (TARLAC), TARLAC, Region III. Reported contract value: ₱59,170,297.08. Status: Reported complete (DPWH). Contractor on record: RD8 BUILDERS CORP UNDER THE NAME OF RD8 BUILDERS. Figures trace to sumbong.
Total Contract Cost