RD8 BUILDERS CORP UNDER THE NAME OF RD8 BUILDERS is listed as a company organization in Philippine public procurement records on this site, with 94 linked DPWH project(s) totaling about ₱2,645,622,621.53. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
RD8 BUILDERS CORP UNDER THE NAME OF RD8 BUILDERS
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 94
- Total value
- ₱2,645,622,621.53
- Published flags
- 3
- Region
- Tarlac DEO · Region III
Licensed officers (PCAB)
- Rampel Luis Padiz De Guzman · Authorized Managing Officer (PCAB license 43511) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for RD8 BUILDERS CORP UNDER THE NAME OF RD8 BUILDERS — not an accusation or finding of wrongdoing.
Score: 88.50 / 100 · Projects in sample: 94 · As of Oct 22, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 80.5/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 80.5
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 76
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 86
- pastTargetOngoingProjects
- 9
- undatedCompletedProjectsExcluded
- 8
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 94
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0.2
- componentScore
- 100
- projectsWithAbcAndCost
- 94
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99/100 · Weight: 11%
- projects
- 94
- componentScore
- 99
- flagsPerProject
- 0.03
- publishedV2Flags
- 3
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 94
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 94 geotagged projects (largest by contract value) — Open full map
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF RIVER CAPACITY ENHANCEM25DO0053 · ₱138,526,398.52 · mapped
- REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER (CASTILLO SECTION, RIGHT BANK), STA. (-)0+936.80 TO STA. (-)1+431.20, CONCEPCION, TARLAC (PACKAGE 3)24CK0112 · ₱98,992,571.93 · mapped
- NATIONAL BUILDING PROGRAM CONSTRUCTION OF DPWH OFFICE BUILDING, TARLAC 1ST DEO, PARSOLINGAN, GERONA, TARLAC, PHASE I23CJ0241 · ₱96,500,000.00 · mapped
- Rehabilitation of Existing Dike along Lucung River (Susuba Section), Phase 4, Sta. 0+000.00 to Sta. 0+634.48, Capas, Tarlac24CK0068 · ₱96,493,309.27 · mapped
- Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right side. Package G, Capas Tarlac, Sta. 3+412.40 to Sta. 3+773.4024CK0125 · ₱95,527,152.18 · mapped
- SUSTAINABLE INFRAS. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRAS./FACILITIES-CONSTRUCTION OF SLOPE REVETMENT STRUCTURE ALONG MADLUM RIVER (DOWNSTREAM) SITIO BALINGCUPANG,BRGY. BIAK NA BATO, SAN MIGUEL, BUL24C00493 · ₱95,002,645.23 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG PAIT MANOK RIVER, SAN MANUEL, TARLAC (SEGMENT 26)25CJ0170 · ₱74,250,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAKET - BAKET RIVER, MONCADA, TARLAC (SEGMENT 14)25CJ0161 · ₱74,250,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CAMILING RIVER CUBCUB SECTION, CUBCUB, MAYANTOC, TARLAC (PACKAGE 3)25CJ0165 · ₱74,250,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BRILLANTE-RANG AYAN-SAPANG BURGOS SECTION (SEGMENT 2), PANIQUI, TARLAC25CJ0018 · ₱74,250,000.00 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Left Dike, Sta. Maria - San Bartolome Section, Tarlac (Package C)23CJ0142 · ₱59,170,297.08 · mapped
- CONSTRUCTION OF TARLAC RIVER LEFT DIKE BYPASS/ DIVERSION ROAD INCLUDING SLOPE PROTECTION (SECTION 2), TARLAC24CJ0228 · ₱50,000,000.00 · mapped
- CONSTRUCTION OF TARLAC RIVER LEFT DIKE BYPASS/ DIVERSION ROAD INCLUDING SLOPE PROTECTION (SECTION 1), TARLAC24CJ0226 · ₱50,000,000.00 · mapped
- CONSTRUCTION OF MASALASA CREEK SERVICE ROAD INCLUDING SLOPE PROTECTION, TARLAC CITY, TARLAC (SEGMENT 36)25CJ0228 · ₱50,000,000.00 · mapped
- CONSTRUCTION OF MASALASA CREEK SERVICE ROAD INCLUDING SLOPE PROTECTION, TARLAC CITY, TARLAC (SEGMENT 34)25CJ0222 · ₱50,000,000.00 · mapped
- CONSTRUCTION OF MASALASA CREEK SERVICE ROAD INCLUDING SLOPE PROTECTION, TARLAC CITY, TARLAC (SEGMENT 37)25CJ0229 · ₱50,000,000.00 · mapped
- CONSTRUCTION OF MASALASA CREEK SERVICE ROAD INCLUDING SLOPE PROTECTION, TARLAC CITY, TARLAC (SEGMENT 35)25CJ0227 · ₱50,000,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAYATING RIVER (SEGMENT 25), CAMILING, TARLAC25CJ0002 · ₱50,000,000.00 · mapped
- CONSTRUCTION OF TARLAC RIVER LEFT DIKE BYPASS/ DIVERSION ROAD INCLUDING SLOPE PROTECTION (SECTION 3), TARLAC24CJ0240 · ₱50,000,000.00 · mapped
- CONSTRUCTION OF SAN ISIDRO CREEK SERVICE ROAD INCLUDING SLOPE PROTECTION, TARLAC CITY, TARLAC (SEGMENT 13)25CJ0186 · ₱49,500,000.00 · mapped
- CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG MASALASA CREEK, PACKAGE R, TARLAC CITY, TARLAC24CJ0372 · ₱49,500,000.00 · mapped
- Construction of Slope Protection with Steel Sheet Pile Foundation along Tarlac River Control Right Dike, Dicolor Section, Gerona, Tarlac (Package A)23CJ0158 · ₱49,500,000.00 · mapped
- CONSTRUCTION OF SAN ISIDRO CREEK SERVICE ROAD INCLUDING SLOPE PROTECTION, TARLAC CITY, TARLAC (SEGMENT 12)25CJ0162 · ₱49,500,000.00 · mapped
- CONSTRUCTION OF FLOOD CONTROL, BARANGAY SAN MIGUEL - STA. MARIA, SAN MANUEL, TARLAC25CJ0152 · ₱49,000,000.00 · mapped
- REHABILITATION OF ROAD AT BARANGAY STA. MONICA, CONCEPCION, TARLAC25CK0090 · ₱48,994,266.16 · mapped
- CONSTRUCTION OF SCHOOL BUILDING TARLAC STATE UNIVERISTY LUCINDA CAMPUS, BRGY. UNGOT, TARLAC CITY, TARLAC25CJ0191 · ₱48,806,959.41 · mapped
- CONSTRUCTION OF BANK SLOPE ALONG UNGOT CREEK (SEGMENT E), TARLAC CITY, TARLAC24CJ0386 · ₱48,250,000.00 · mapped
- REHABILITATION OF EXISTING DIKE ALONG O'DONNELL RIVER, STA. 5 + 990 - STA. 6 + 416, BARANGAY BUENO SECTION, LEFT BANK, CAPAS, TARLAC24CK0180 · ₱48,247,692.87 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PARUA RIVER, UPSTREAM OF SCTEX BRIDGE, BANGCU SECTION, BAMBAN, TARLAC24CK0196 · ₱48,243,248.87 · mapped
- PREVENTIVE MAINTENANCE - SECONDARY ROADS - FAIRVIEW AVE (S05469LZ) - CHAINAGE 000 - CHAINAGE 699, QUEZON CITY25OF0078 · ₱48,117,129.50 · mapped
- CONSTRUCTION OF 3STY12CL MABABANABA HIGH SCHOOL, SAN JOSE, TARLAC24CJ0323 · ₱44,976,242.73 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE III), LA PAZ, TARLAC25CK0036 · ₱38,206,047.56 · mapped
- ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG CONCEPCION - CAPAS ROAD, CONCEPCION, TARLAC24CK0006 · ₱30,078,619.60 · mapped
- STATE UNIVERSITIES AND COLLEGES (SUCS)-CONSTRUCTION OF MULTI-PURPOSE BUILDING (DORMITORY), TARLAC STATE UNIVERSITY, PROVINCE OF TARLAC24C00611 · ₱29,849,912.25 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY NAGKAISANG NAYON, QUEZON CITY24OF0215 · ₱29,396,209.97 · mapped
- NETWORK DEVELOPMENT PROGRAM - OFF CARRIAGEWAY IMPROVEMENT: SECONDARY ROADS - CONCEPCION - CAPAS ROAD, CONCEPCION, TARLAC24CK0017 · ₱29,385,403.79 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MANGGAHAN, PASIG CITY24OB0440 · ₱29,254,483.03 · mapped
- CONSTRUCTION OF ROAD, SAN NARCISO TO MANGANDINGAY, SAN MANUEL, TARLAC25CJ0204 · ₱24,750,000.00 · mapped
- CONSTRUCTION OF MESS HALL FOR SCHOOL OF CANDIDATE SOLDIERS (SCS), TRADOC, CAMP O'DONNELL, BRGY. STA. LUCIA, CAPAS, TARLAC20CK0043 · ₱21,387,859.70 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES CONSTRUCTION OF MULTI-PURPOSE BUILDING RHU (EMERGENCY CLINIC), BRGY. BULO, VICTORIA, TARLAC23CJ0236 · ₱19,800,000.00 · mapped
- CONCRETING OF BRGY. BALAYANG FMR, BRGY. BALAYANG, VICTORIA, TARLAC24CJ0288 · ₱16,915,000.00 · mapped
- CONSTRUCTION OF FARM-TO-MARKET ROAD AT BARANGAY ABAGON, GERONA, TARLAC24CJ0356 · ₱14,925,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN BARTOLOME, QUEZON CITY24OF0307 · ₱14,701,470.30 · mapped
- Rehabilitation of Sabo Dam at Camangaan West CIS, Moncada, Tarlac25CJ0129 · ₱14,700,000.00 · mapped
- BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES REHABILITATION OF ROAD IN SAN MANUEL, TARLAC22CJ0202 · ₱14,607,176.83 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY BALAYANG, VICTORIA, TARLAC23CJ0321 · ₱14,330,249.80 · mapped
- CONSTRUCTION OF ROAD AT SAN MARTIN TO LILIBANGAN ROAD, CONCEPCION, TARLAC22CK0046 · ₱11,757,330.15 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ROQUE, LA PAZ, TARLAC24CK0141 · ₱11,639,545.59 · mapped
- CONSTRUCTION OF ROAD, BARANGAY BALANOY - BARANGAY DUMARAIS, LA PAZ, TARLAC22CK0040 · ₱11,411,536.20 · mapped
- CONSTRUCTION OF ONE (1) STOREY - FOUR (4) CLASSROOMS SCHOOL BUILDING (WITHOUT TOILET) WITH PROVISION OF RAINWATER COLLECTOR, WATER AND SANITATION FACILITIES (4 SEATER), SCHOOL FURNITURE, AND WATER SYSTEM STA. MARIA ES, SAN MANUEL, TARLAC22CJ0259 · ₱11,291,887.62 · mapped
Across government
- DPWH Infrastructure: 55 awards · ₱2,558,210,675.57
- NIA Infrastructure: 3 awards · ₱47,591,955.70
- Municipality of San Manuel, Tarlac Infrastructure: 1 award · ₱3,995,000.00
- Municipality of Mayantoc, Tarlac Infrastructure: 2 awards · ₱3,840,702.23
- 25OF0078 - PREVENTIVE MAINTENANCE - SECONDARY ROAD₱48,117,129.50· 2025-10-03· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON CITY 1ST ED
- 25CP0003₱90,354,234.99· 2025-07-21· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( BULACAN 3RD DEO) -
- 25CK0119₱9,700,715.14· 2025-05-14· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 2ND-DEO
- 25CJ0186₱48,782,453.80· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CK0090₱47,994,051.36· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 2ND-DEO
- 25CJ0152₱47,477,056.87· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0227₱48,807,727.46· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0228₱48,856,999.75· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0191₱48,806,959.41· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0162₱48,857,471.63· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0170₱73,173,254.04· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0204₱24,008,010.07· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0229₱48,906,744.16· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0161₱71,949,079.06· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0222₱48,956,300.65· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0165₱72,023,342.14· 2025-03-27· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25OF0220 - REHABILITATION/RECONSTRUCTION OF FLOOD₱47,236,776.38· 2025-03-25· Other repair· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON CITY 1ST ED
- 25CK0059₱48,505,574.54· 2025-03-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 2ND-DEO
- 25CP0049₱47,627,039.74· 2025-03-25· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ( BULACAN 3RD DEO) -
- 25CK0036₱38,206,047.56· 2025-03-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 2ND-DEO
- 24CK0205₱93,239,045.34· 2025-02-28· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 2ND-DEO
- 24OF0307 (RE-BID FROM ID NO. 23OF0177) - CONSTRUCT₱14,701,470.30· 2025-02-18· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - QUEZON CITY 1ST ED
- 25DO0053₱133,629,038.02· 2025-02-07· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - RIZAL II DEO
- 25CJ0018₱70,182,259.93· 2025-02-05· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
- 25CJ0024₱6,859,420.71· 2025-01-23· Other construction· DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS - TARLAC 1ST DEO
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
