Flood Control and Drainage17BD0026

MF02: CONSTRUCTION OF SAN ISIDRO FLOOD CONTROL SYSTEM (DOWNSTREAM), STA. 1+300-STA. 1+446, SAN ISIDRO, IGUIG, CAGAYAN

MF02: CONSTRUCTION OF SAN ISIDRO FLOOD CONTROL SYSTEM (DOWNSTREAM), STA. 1+300-STA. 1+446, SAN ISIDRO, IGUIG, CAGAYAN is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱42,606,975.82. Status: Reported complete (DPWH). Contractor on record: DEKM CONST. Figures trace to dpwh.

Cagayan 3rd DEO, Region II
Region: Region II

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱45,803

    Probable match · score 0.94

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0025300 · ₱5,300,000 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱42,606,976 · DEKM CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-02-13 → 2025-09-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱291,829 per linear m= 1.9x the Region II median (n=146)

Contract cost ₱42,606,976 ÷ 146 linear m read from the DPWH title (“STA. 1+300-STA. 1+446”; station range length (Sta. a+b to c+d)). National percentile: 87. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

Outside mapped flood-hazard zones · Cagayan

Based on the coordinates published with the DPWH record and NOAH file Cagayan.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: MF02: CONSTRUCTION OF SAN ISIDRO FLOOD CONTROL SYSTEM (DOWNSTREAM), STA. 1+300-STA. 1+446, SAN ISIDRO, IGUIG, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 94%

UACS
18001
Amount
₱45,803,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of San Isidro Flood Control System (Downstream), Sta. 1+300 – Sta. 1+446, San Isidro, Iguig, Cagayan
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0025300

₱5,300,000.00 · FY2017

Released to Regional Office - Proper (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

MF02 Construction of San Isidro Flood Control Sy

₱42,606,975.82 · DEKM CONSTRUCTION

Award / contract ref: 17BD0026

Contractor

B

114 projects · ₱978.3M total · 0 flags

4. Implementation

Contract Amount

₱42,606,975.82

Progress

Reported complete (DPWH)

Start Date

February 21, 2017

Target End

November 17, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanIguigSan Isidro
Storms whose wind field reached it
Peilou 2026Noul 2026Fung-Wong 2025Matmo 2025Ragasa 2025
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.