Roads16HF0042No coordinates published by DPWH

CONCRETING OF BRGY. TUBIGAGMANOK - BOG-O FARM-TO-MARKET ROAD, ASTURIAS, CEBU

CONCRETING OF BRGY. TUBIGAGMANOK - BOG-O FARM-TO-MARKET ROAD, ASTURIAS, CEBU is a DPWH-tracked public work in Cebu 3rd DEO, Region VII. Reported contract value: ₱4,760,824.62. Status: Reported complete (DPWH). Contractor on record: GOWIL BUILDERS. Figures trace to dpwh.

Cebu 3rd DEO, Region VII

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region VII

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROI-16-0022690 · ₱14,409,557 · release to the district office, not itemized per project

    Possible match · score 0.62

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱4,760,825 · GOWIL BUILDERS

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BRGY. TUBIGAGMANOK - BOG-O FARM-TO-MARKET ROAD, ASTURIAS, CEBU

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Combado River - Himungbongan Flood Control Structures, Sitio Combado, Brgy. Cantu - od, Balamban, Cebu
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROI-16-0022690

₱14,409,557.00 · FY2016

Released to Mariano Marcos Memorial Hospital and Medical CTo (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

16HF0042

₱4,760,824.62 · GOWIL BUILDERS

Award / contract ref: 16HF0042

Contractor

B

54 projects · ₱690.9M total · 0 flags

Other projects by this contractor

No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG GUADALUPE RIVER, BAR

Cebu City DEO, Region VII

2024₱49.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

REHABILITAIONRECONSTRUCTIONUPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PMSHDM-4 OF CONSOLACION -TAYUD - LILOAN ROAD, CHAINAGE 950 - CHAINAGE 2823, CONSOLACION

Cebu 6th DEO, Region VII

2017₱44.9M
Reported complete (DPWH)
No sat.

Construction of Flood Mitigation Structure along Guadalupe River, Barangay Sambag 1, Cebu City

CEBU CITY (CAPITAL) (CEBU), CEBU, Region VII

2023₱44.0M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROADSYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE - SECONDARY ROADS - 8TH ST. -(S00022CB) CHAINAGE 0 - CHAINAGE 619, (S00384CB) CHAINAGE 0 - CHAINAGE 605, CEBU CITY

Cebu City DEO, Region VII

2022₱44.0M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG GUADALUPE RIVER, PACKAGE 2, BARANGAY SAPANGDAKU,

Cebu City DEO, Region VII

2025₱40.9M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-TERTIARY ROADS- 5TH ST (S00047CB) CHAINAGE 209-CHAINAGE 424, (S00340CB) CHAINAGE 177-CHAINAGE 302, CEBU CITY

Cebu City DEO, Region VII

2023₱32.2M
Reported complete (DPWH)
View all 54 projects →

4. Implementation

Contract Amount

₱4,760,824.62

Progress

Reported complete (DPWH)

Start Date

May 29, 2016

Target End

August 1, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VII (Central Visayas)Cebu
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.