INSTALLATION OF GABIONS AND MATTRESSES ALONG DAVAO RIVER BASIN TIGATTO FLOOD CONTROL STA. 17+250-STA. 17+847, LEFT BANK, DAVAO CITY
INSTALLATION OF GABIONS AND MATTRESSES ALONG DAVAO RIVER BASIN TIGATTO FLOOD CONTROL STA. 17+250-STA. 17+847, LEFT BANK, DAVAO CITY is a DPWH-tracked public work in Davao City DEO, Region XI. Reported contract value: ₱48,350,299.01. Status: Reported complete (DPWH). Contractor on record: O G SANTOS CONST. Figures trace to dpwh.
Total Contract Cost



