Roads23OD0185

REHABILITATION OF ROAD ALONG SAN DIEGO ST., 4TH ST., AND 3RD ST., CALOOCAN CITY

REHABILITATION OF ROAD ALONG SAN DIEGO ST., 4TH ST., AND 3RD ST., CALOOCAN CITY is a DPWH-tracked public work in Metro Manila 3rd DEO, National Capital Region. Reported contract value: ₱8,619,072.69. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: AYLAN CONST. Figures trace to dpwh.

Metro Manila 3rd DEO, National Capital Region
Region: National Capital Region

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱50,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱8,619,073 · AYLAN CONSTRUCTION AND TRADING

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-11-03 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION OF ROAD ALONG SAN DIEGO ST., 4TH ST., AND 3RD ST., CALOOCAN CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Wall along Camarin Creek (Left Side) Brgy. 178 and 180, Sta. 0+000 to Sta. 0+027, Caloocan City
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Metro Manila 3rd DEO · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

23OD0185

₱8,619,072.69 · AYLAN CONSTRUCTION AND TRADING

Award / contract ref: 23OD0185

Contractor

C

127 projects · ₱3.4B total · 0 flags

4. Implementation

Contract Amount

₱8,619,072.69

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

May 19, 2023

Target End

April 14, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “REHABILITATION OF ROAD ALONG SAN DIEGO ST., 4TH ST., AND 3RD ST., CALOOCAN CITY.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/743876a5-f8e1-45ca-9afb-4941438f9ac6

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)City of CaloocanBarangay 114
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.