Flood Control and Drainage18LB0034

INSTALLATION OF GABIONS AND MATTRESSES ALONG DAVAO RIVER FLOOD CONTROL STA.8+277 -STA. 8+377 LEFT B

INSTALLATION OF GABIONS AND MATTRESSES ALONG DAVAO RIVER FLOOD CONTROL STA.8+277 -STA. 8+377 LEFT B is a DPWH-tracked public work in Davao City DEO, Region XI. Reported contract value: ₱9,735,951.17. Status: Reported complete (DPWH). Contractor on record: ER SALAC BUILDERS CORP. Figures trace to dpwh.

Davao City DEO, Region XI
Region: Region XI

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱50,000

    Probable match · score 0.89

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-LGRCB-18-0025292 · ₱50,900,000 · release to the district office, not itemized per project

    Possible match · score 0.78

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18LB0034 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-02-20 → 2026-01-21

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Flood wall / dike / revetment, cost per linear meter (flood control structure)

₱97,360 per linear m= 1.0x the Region XI median (n=68)

Contract cost ₱9,735,951 ÷ 100 linear m read from the DPWH title (“STA.8+277 -STA. 8+377”; station range length (Sta. a+b to c+d)). National percentile: 38. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Davao del Sur

Based on the coordinates published with the DPWH record and NOAH file DavaoDelSur.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: INSTALLATION OF GABIONS AND  MATTRESSES ALONG DAVAO RIVER FLOOD CONTROL STA.8+277 -STA. 8+377 LEFT B

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 89%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Installation of Gabions and Mattresses along Davao River (Sta. 8+377 to Sta. 8+921, Left Bank), Awhag Section, Davao City
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-LGRCB-18-0025292

₱50,900,000.00 · FY2018

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

4. Implementation

Contract Amount

₱9,735,951.17

Progress

Reported complete (DPWH)

Start Date

April 19, 2018

Target End

September 13, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)City of DavaoBarangay 19-B
Storms whose wind field reached it
Jelawat 2023
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.