Roads19GG0001

ROAD WIDENING OF PASSI - SAN RAFAEL - LEMERY - SARA ROAD, K0053 + 414.30 - K0055 + 768.90. K0052 + 600.30 - K0053 + 344.70

ROAD WIDENING OF PASSI - SAN RAFAEL - LEMERY - SARA ROAD, K0053 + 414.30 - K0055 + 768.90. K0052 + 600.30 - K0053 + 344.70 is a DPWH-tracked public work in Iloilo 2nd DEO, Region VI. Reported contract value: ₱72,131,370.85. Status: Reported complete (DPWH). Contractor on record: WOODLAND CONST. Figures trace to dpwh.

Iloilo 2nd DEO, Region VI
Region: Region VI

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-BMB-E-19-0009858 · ₱304,118 · release to the district office, not itemized per project

    Possible match · score 0.69

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19GG0001 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-09-02 → 2025-12-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱23,275,692 per km= 0.8x the Region VI median (n=261)

Contract cost ₱72,131,371 ÷ 3.099 km read from the DPWH title (“K0053 + 414.30 - K0055 + 768.90; K0052 + 600.30 - K0053 + 344.70”; K-post / station range length). National percentile: 15. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD WIDENING OF PASSI - SAN RAFAEL - LEMERY - SARA ROAD, K0053 + 414.30 - K0055 + 768.90. K0052 + 600.30 - K0053 + 344.70

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-19-0009858

₱304,118.00 · FY2019

Released to 000000 - Metals Industry Research Dan and Development Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱72,131,370.85

Progress

Reported complete (DPWH)

Start Date

July 26, 2019

Target End

March 25, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region VI (Western Visayas)IloiloSan EnriqueAsisig
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.