Roads17BD0061

MFO1: ROAD UPGRADING (UNPAVED TO PAVED)-TERTIARY, P00119815LZ, GADU-CARILUCUD-NABBOTUAN-PALAO-MACUTAY ROAD, S00793LZ, CHAINAGE 12532 TO CHAINAGE 14265, SOLANA, CAGAYAN

MFO1: ROAD UPGRADING (UNPAVED TO PAVED)-TERTIARY, P00119815LZ, GADU-CARILUCUD-NABBOTUAN-PALAO-MACUTAY ROAD, S00793LZ, CHAINAGE 12532 TO CHAINAGE 14265, SOLANA, CAGAYAN is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱35,796,579.68. Status: Reported complete (DPWH). Contractor on record: CREST92 CONST. Figures trace to dpwh.

Cagayan 3rd DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱47,070 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-E-17-0025300 · ₱5,300,000 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱35,796,580 · CREST CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-02-25 → 2023-08-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: MFO1: ROAD UPGRADING (UNPAVED TO PAVED)-TERTIARY, P00119815LZ, GADU-CARILUCUD-NABBOTUAN-PALAO-MACUTAY ROAD, S00793LZ, CHAINAGE 12532 TO CHAINAGE 14265, SOLANA, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱47,070,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Natappian Flood Control System, Sta. 0+000 – Sta. 0+220, Natappian, Solana, Cagayan
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-E-17-0025300

₱5,300,000.00 · FY2017

Released to Regional Office - Proper (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

MF01 Road Upgrading (Unpaved to Paved) – Tertiary

₱35,796,579.68 · CREST CONSTRUCTION

Award / contract ref: 17BD0061

Contractor

C

9 projects · ₱216.5M total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE, TERTIARY ROADS, CAGAYAN APAYAO ROAD, K0492+255-K0493+669, K0493+685-K0493+965, K0498+777-K0502+601, K0502+601-K0503+500, SOLANA, CAGAYAN

Cagayan 3rd DEO, Region II

2018₱49.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS ROAD AND DIVERSION ROAD- TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG-LINAO-ATULAYAN-BAGAY-BUNTUN) INCLUDING ROW AND SLOPE PROTECTION, TUGUEGARAO CITY, CAGAYAN, PHASE II

Region II, Region II

2018₱41.1M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES & PROP. AGAINST MAJOR FLOODS - FLOOD MGMT. PROG. - CONST./ REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCT. ALONG PINACANAUAN RIVER, BRGY. PATAGUELEG, PEÑABLANCA, CAGAYAN

Cagayan 3rd DEO, Region II

2023₱29.4M
Past target date (DPWH On-Going)
No sat.

MFO1:NAT'L. RD. SERVICES-...HDM-4-SECONDARY, TUG. DIV. ROAD 2, S04191LZ,K0482+(-980)-K0482+(-165),K0482+(-89)-K0482+475,K0482+475-K0483+210,K0483+210-K0483+298,K0483+298-K0483+298-K0484+555,K0483+929-K0483+965,TUG. DIV. ROAD 2, TUG. CITY

Cagayan 3rd DEO, Region II

2017₱20.7M
Reported complete (DPWH)
No sat.

CSSP- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO CALLAO CAVES TOURISM ZONE (TAWI-CALLAO ROAD), BRGY PATAGUELEG, PEÑABLANCA, CAGAYAN

Cagayan 3rd DEO, Region II

2022₱14.7M
Reported complete (DPWH)
No sat.

REHAB./ RECONST.OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD K0485+616 - K0485+641 (R/S), K0486+(-100) - K0486+(-070) (R/S), K0485+032 - K0485+130(R/S) & K0485+006 - K0485+130 (L/S), PEÑABLANCA, CAGAYAN

Cagayan 3rd DEO, Region II

2022₱13.5M
Reported complete (DPWH)
View all 9 projects →

4. Implementation

Contract Amount

₱35,796,579.68

Progress

Reported complete (DPWH)

Start Date

March 6, 2017

Target End

October 1, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanSolanaParug-parug
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.