Roads18B00070

CONSTRUCTION OF BY-PASS ROAD AND DIVERSION ROAD- TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG-LINAO-ATULAYAN-BAGAY-BUNTUN) INCLUDING ROW AND SLOPE PROTECTION, TUGUEGARAO CITY, CAGAYAN, PHASE II

CONSTRUCTION OF BY-PASS ROAD AND DIVERSION ROAD- TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG-LINAO-ATULAYAN-BAGAY-BUNTUN) INCLUDING ROW AND SLOPE PROTECTION, TUGUEGARAO CITY, CAGAYAN, PHASE II is a DPWH-tracked public work in Region II, Region II. Reported contract value: ₱41,097,454.01. Status: Reported complete (DPWH). Contractor on record: CREST92 CONST. Figures trace to dpwh.

Region II, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18B00070 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-02-13 → 2025-09-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF BY-PASS ROAD AND DIVERSION ROAD- TUGUEGARAO WEST DIVERSION ROAD (JCT. CARIG-LINAO-ATULAYAN-BAGAY-BUNTUN) INCLUDING ROW AND SLOPE PROTECTION, TUGUEGARAO CITY, CAGAYAN, PHASE II

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2018 GAA. DBM GAA FY2018

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

9 projects · ₱216.5M total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE, TERTIARY ROADS, CAGAYAN APAYAO ROAD, K0492+255-K0493+669, K0493+685-K0493+965, K0498+777-K0502+601, K0502+601-K0503+500, SOLANA, CAGAYAN

Cagayan 3rd DEO, Region II

2018₱49.4M
Reported complete (DPWH)
No sat.

MFO1: ROAD UPGRADING (UNPAVED TO PAVED)-TERTIARY, P00119815LZ, GADU-CARILUCUD-NABBOTUAN-PALAO-MACUTAY ROAD, S00793LZ, CHAINAGE 12532 TO CHAINAGE 14265, SOLANA, CAGAYAN

Cagayan 3rd DEO, Region II

2017₱35.8M
Reported complete (DPWH)
No sat.

OO2: PROTECT LIVES & PROP. AGAINST MAJOR FLOODS - FLOOD MGMT. PROG. - CONST./ REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCT. ALONG PINACANAUAN RIVER, BRGY. PATAGUELEG, PEÑABLANCA, CAGAYAN

Cagayan 3rd DEO, Region II

2023₱29.4M
Past target date (DPWH On-Going)
No sat.

MFO1:NAT'L. RD. SERVICES-...HDM-4-SECONDARY, TUG. DIV. ROAD 2, S04191LZ,K0482+(-980)-K0482+(-165),K0482+(-89)-K0482+475,K0482+475-K0483+210,K0483+210-K0483+298,K0483+298-K0483+298-K0484+555,K0483+929-K0483+965,TUG. DIV. ROAD 2, TUG. CITY

Cagayan 3rd DEO, Region II

2017₱20.7M
Reported complete (DPWH)
No sat.

CSSP- CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO CALLAO CAVES TOURISM ZONE (TAWI-CALLAO ROAD), BRGY PATAGUELEG, PEÑABLANCA, CAGAYAN

Cagayan 3rd DEO, Region II

2022₱14.7M
Reported complete (DPWH)
No sat.

REHAB./ RECONST.OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD K0485+616 - K0485+641 (R/S), K0486+(-100) - K0486+(-070) (R/S), K0485+032 - K0485+130(R/S) & K0485+006 - K0485+130 (L/S), PEÑABLANCA, CAGAYAN

Cagayan 3rd DEO, Region II

2022₱13.5M
Reported complete (DPWH)
View all 9 projects →

4. Implementation

Contract Amount

₱41,097,454.01

Progress

Reported complete (DPWH)

Start Date

January 3, 2019

Target End

August 5, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanTuguegarao CityLinao Norte
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.