Roads22KB0098

ROAD WIDENING ALONG BUKIDNON-DAVAO CITY ROAD, K1583+800-K1584+000, K1596+865-K1597+000, K1608+176-K1608+271, PALACAPAO, QUEZON, BUKIDNON

ROAD WIDENING ALONG BUKIDNON-DAVAO CITY ROAD, K1583+800-K1584+000, K1596+865-K1597+000, K1608+176-K1608+271, PALACAPAO, QUEZON, BUKIDNON is a DPWH-tracked public work in Bukidnon 2nd DEO, Region X. Reported contract value: ₱82,025,000.00. Status: Reported complete (DPWH). Contractor on record: JT GAMOLO CONST INCORPORATION FORMERLY:J T GAMOLO CONST. Figures trace to dpwh.

Bukidnon 2nd DEO, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱80,794,287 · J.T. GAMOLO CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-02-02 → 2019-02-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱190,755,814 per km= 5.4x the Region X median (n=383)

Contract cost ₱82,025,000 ÷ 0.43 km read from the DPWH title (“K1583+800-K1584+000; K1596+865-K1597+000; K1608+176-K1608+271”; K-post / station range length). National percentile: 100. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD WIDENING ALONG BUKIDNON-DAVAO CITY ROAD, K1583+800-K1584+000, K1596+865-K1597+000, K1608+176-K1608+271, PALACAPAO, QUEZON, BUKIDNON

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Maramag Maradugao Road (Downstream), Macapantig Bridge with Slope Protection, Kalilangan, Bukidnon
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Bukidnon 2nd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

roads

₱80,794,286.90 · J.T. GAMOLO CONSTRUCTION

Award / contract ref: 22KB0098

Contractor

B

175 projects · ₱6.3B total · 0 flags

4. Implementation

Contract Amount

₱82,025,000.00

Progress

Reported complete (DPWH)

Start Date

April 5, 2022

Target End

March 22, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “ROAD WIDENING ALONG BUKIDNON-DAVAO CITY ROAD, K1583+800-K1584+000, K1596+865-K1597+000, K1608+176-K1608+271, PALACAPAO, QUEZON, BUKIDNON.” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/78f31511-1890-44be-9303-b1814a0095d7

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)BukidnonQuezonPinilayan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.