Construction of Flood Mitigation Structure23MH0021

Construction of River Bank Protection/Flood Control (Downstream Side) Barangay Biwang, Bagumbayan, Sultan Kudarat

Construction of River Bank Protection/Flood Control (Downstream Side) Barangay Biwang, Bagumbayan, Sultan Kudarat is a DPWH-tracked public work in BAGUMBAYAN (SULTAN KUDARAT), SULTAN KUDARAT, Region XII. Reported contract value: ₱44,679,385.64. Status: Reported complete (DPWH). Contractor on record: PALMARES CONST & GEN MERCHANDISE CORP FORMERLY: PALMARES GEN MERCHANDISE. Figures trace to sumbong.

BAGUMBAYAN (SULTAN KUDARAT), SULTAN KUDARAT, Region XII
Region: Region XII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱50,000

    Probable match · score 1.00

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23MH0021 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-11-26 → 2025-09-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

Medium flood hazard · Sultan Kudarat

Based on the coordinates published with the DPWH record and NOAH file SultanKudarat.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of River Bank Protection/Flood Control (Downstream Side) Barangay Biwang, Bagumbayan, Sultan Kudarat

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 100%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of River Bank Protection/Flood Control (Downstream Side) Barangay Biwang, Bagumbayan, Sultan Kudarat
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Sultan Kudarat 2nd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱44,679,385.64

Progress

Reported complete (DPWH)

Start Date

March 16, 2023

Target End

November 19, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)Sultan KudaratIsulanKalawag III
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.