Buildings and Facilities18MF0017

CONSTRUCTION OF BARANGAY HALL AT BRGY. BAUMOL, LAMBAYONG, SULTAN KUDARAT.

CONSTRUCTION OF BARANGAY HALL AT BRGY. BAUMOL, LAMBAYONG, SULTAN KUDARAT. is a DPWH-tracked public work in Sultan Kudarat 1st DEO, Region XII. Reported contract value: ₱2,568,732.56. Status: Reported complete (DPWH). Contractor on record: DALANON CONST CORP FORMERLY:DALANON CONST REF SUPPLY. Figures trace to dpwh.

Sultan Kudarat 1st DEO, Region XII
Region: Region XII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2018 · ₱50,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVI-18-0004078 · ₱54,219 · release to the district office, not itemized per project

    Possible match · score 0.73

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18MF0017 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-12-21 → 2025-10-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF BARANGAY HALL AT BRGY. BAUMOL, LAMBAYONG, SULTAN KUDARAT.

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of River Control along Kabulakan, Lambayong, Sultan Kudarat
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-18-0004078

₱54,219.00 · FY2018

Released to Caduha-an National High re School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

121 projects · ₱1.5B total · 0 flags

4. Implementation

Contract Amount

₱2,568,732.56

Progress

Reported complete (DPWH)

Start Date

March 8, 2018

Target End

September 13, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Cite this record

Love the Philippines. “CONSTRUCTION OF BARANGAY HALL AT BRGY. BAUMOL, LAMBAYONG, SULTAN KUDARAT..” Source: DPWH. Data as of October 21, 2026. https://lovethephilippines.com/projects/79f86051-fec3-444b-b59c-bf8afaf68043

The official source record is authoritative. An indicator on this site is not a finding of wrongdoing.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)Sultan KudaratLambayongPidtiguian
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.