GAA 2024 OO-124PB0020

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0609+153 - K0

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0609+153 - K0 is a DPWH-tracked public work in Apayao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱4,331,586.79. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: AY-CA CONST SUPPLY. Figures trace to dpwh.

Apayao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱100,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24PB0020 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-05-07 → 2025-04-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0609+153 - K0

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱100,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Barren River ( Downstream ) Flood Control Structure along Chico River Basin, Sta. 37 + 200 - Sta. 38 + 973
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Apayao 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

10 projects · ₱95.0M total · 0 flags

Other projects by this contractor

No sat.

CONCRETING OF BRGY. KARAGAWAN FMR, BRGY. KARAGAWAN,KABUGAO,APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱24.7M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS, CONNER- KABUGAO RD- K0593+230-K0593+334

Apayao 1st DEO, Cordillera Administrative Region

2025₱19.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM(BIP)- MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING,(EVACUATION CENTER), BARANGAY PUGUIN, CONNER, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱9.8M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM(BIP), BIP-MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, (DEPED ADMIN BUILDING) KAIHS, LUTTUACAN KABUGAO,APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱9.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOM UNDER THE DEPED'S BASIC EDUCATION FACILITIES FUND: CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING MUSIMUT NATIONAL HIGH SCHOOL, BARANGAY MUSIMUT, KABUGAO, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2024₱9.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANSLIDE-TERTIARY ROADS-PAYAO-ILOCOS NORTE ROAD-K0610+100-K0610+132

Apayao 1st DEO, Cordillera Administrative Region

2025₱5.8M
Past target date (DPWH On-Going)
View all 10 projects →

4. Implementation

Contract Amount

₱4,331,586.79

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

April 8, 2024

Target End

August 28, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)ApayaoPudtolAurora
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.