Construction of Flood Control Structure along Ala River ( Impao- Dansuli Section), Isulan, Sultan Kudarat.
Construction of Flood Control Structure along Ala River ( Impao- Dansuli Section), Isulan, Sultan Kudarat. is a DPWH-tracked public work in ISULAN (CAPITAL) (SULTAN KUDARAT), SULTAN KUDARAT, Region XII. Reported contract value: ₱47,943,654.07. Status: Reported complete (DPWH). Contractor on record: KANAWAY BUILDERS CORP. Figures trace to sumbong.
Total Contract Cost

