Roads22E00092

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONSTRUCTION OF ROAD, LIMINANGCONG-CATABAN ROAD TO NATIONAL HIGHWAY, TAYTAY, PALAWAN, STA. 2+094-STA. 4+515; STA. 5+398-STA. 5+598; STA. 6+510-STA. 7+280, PALAWAN

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONSTRUCTION OF ROAD, LIMINANGCONG-CATABAN ROAD TO NATIONAL HIGHWAY, TAYTAY, PALAWAN, STA. 2+094-STA. 4+515; STA. 5+398-STA. 5+598; STA. 6+510-STA. 7+280, PALAWAN is a DPWH-tracked public work in Region IV-B, Region IV-B. Reported contract value: ₱93,507,738.23. Status: Past target date (DPWH On-Going). Contractor on record: YURICH BUILDERS AND CONST SUPPLY INC 37064. Figures trace to dpwh.

Region IV-B, Region IV-B
Region: Region IV-B

Money Trail

1. Appropriation

No GAA appropriation line matched for this project at current confidence thresholds.

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 37064

153 projects · ₱5.1B total · 0 flags

Other projects by this contractor

No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, UPSTREAM LEFTSIDE, ABORLAN, PALAWAN

Region IV-B, Region IV-B

2025₱229.9M
Past target date (DPWH On-Going)
No sat.

CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ABORLAN RIVER WATERWAY, PTO. PRINCESA SOUTH ROAD, DOWNSTREAM RIGHTSIDE, ABORLAN, PALAWAN

Region IV-B, Region IV-B

2025₱229.9M
Past target date (DPWH On-Going)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITUIES- CONST. OF PUNANG RIVER FLOOD CONTROL STRUCTURE, SOFRONIO, ESPANOLA, PALAWAN

Region IV-B, Region IV-B

2024₱193.0M
Reported complete (DPWH)

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONSTRUCTION OF MARABAHAY SHORE PROTECTION STRUCTURE/CAUSEWAY, BATARAZA, PALAWAN

Region IV-B, Region IV-B

2023₱193.0M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF RIZAL AVENUE EXTENSION BOARDWALK, BRGY. BANCAO-BANCAO, PTO. PRINCESA CITY,

Region IV-B, Region IV-B

2023₱186.1M
Past target date (DPWH On-Going)
No sat.

WIDENING OF PERMANENT BRIDGES- BABUYAN BRIDGE (B00095PW) ALONG PUERTO PRINCESA NORTH ROAD, PALAWAN

Region IV-B, Region IV-B

2023₱159.2M
Reported complete (DPWH)
View all 153 projects →

4. Implementation

Contract Amount

₱93,507,738.23

Progress

Past target date (DPWH On-Going)

Start Date

July 6, 2022

Target End

February 9, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.