Buildings and Facilities19NA0078

CONSTRUCTION OF 1 STY 6 CL AT PUTING BATO NATIONAL HIGH SCHOOL, CABADBARAN CITY

CONSTRUCTION OF 1 STY 6 CL AT PUTING BATO NATIONAL HIGH SCHOOL, CABADBARAN CITY is a DPWH-tracked public work in Agusan del Norte DEO, Region XIII. Reported contract value: ₱8,405,868.81. Status: Reported complete (DPWH). Contractor on record: REYROSE CONST. Figures trace to dpwh.

Agusan del Norte DEO, Region XIII
Region: Region XIII

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROIII-19-0008706 · ₱406,000 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19NA0078 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-07-09 → 2025-11-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱1,400,978 per classroom= 1.0x the Region XIII median (n=254)

Contract cost ₱8,405,869 ÷ 6 classroom read from the DPWH title (“1 STY 6 CL”; classroom count in title). National percentile: 34. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1 STY 6 CL AT PUTING BATO NATIONAL HIGH SCHOOL, CABADBARAN CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROIII-19-0008706

₱406,000.00 · FY2019

Released to Taal High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

4. Implementation

Contract Amount

₱8,405,868.81

Progress

Reported complete (DPWH)

Start Date

December 1, 2019

Target End

June 12, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Agusan del NorteCity of CabadbaranPuting Bato
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.